Soekarno–Hatta Airport Skytrain

Soekarno–Hatta Airport Skytrain
Soekarno-Hatta Airport Skytrain used for airport terminals shuttle service
Overview
Native name Kalayang Bandara Internasional Soekarno-Hatta
Status Operational
Owner Angkasa Pura II
Locale Soekarno–Hatta International Airport serving Jakarta
Stations 4
Service
Type Automated people mover (APM)
Operator(s) Angkasa Pura II
Rolling stock Woojin Automated People Mover System
History
Opened 17 September 2017
Technical
Line length 3.05 km (1.90 mi)
Electrification Third rail
Route map

Soekarno–Hatta Terminal 3
Soekarno–Hatta Terminal 2
Soekarno–Hatta Terminal 1
Integrated Terminal Building
SHIA
Skytrain Depot

The Soekarno–Hatta Airport Skytrain (Indonesian: Kalayang Bandara Soekarno–Hatta) is a semi-driverless 3.05 kilometre Automated People Mover System (APMS) which connects Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge. Trains are spaced 5 minutes apart, with 7 minutes needed to get from Terminal 1 to Terminal 3.

Rolling stock

Automated People Mover System at Terminal 1 Station

The system uses Airport Automated People Mover System rubber-tyred metro manufactured by state-owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries. Three train units operate with each train unit consisting of two cars. They are capable to transport 176 passengers in one trip. The train travels at a speed of 60 kilometers per hour. Each trainset is equipped with automated guide-way transit (AGT) technology. The system is capable for automated operations, but its implementation have been delayed pending trials conducted by LEN Industri.

Stations

Skytrain Terminal 3 Station

There are 4 stations served by Airport Skytrain; Terminal 1, 2 and 3 each has one station. The airport shuttle Skytrain is integrated to SHIA railway station, from where passengers can conveniently travel to–and from–Jakarta city center by Soekarno–Hatta Airport Rail Link.

Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application, the time was variable . All Skytrain stations are equipped with platform screen doors and have information screens displaying real-time arrival time of the next train. Skytrain has been operational since 17 September 2017.

Station Transfer/Notes
Terminal 3 Terminal station

Airport interchange Soekarno-Hatta Terminal 3

Bus Terminal Terminal 3 Airport Bus Terminal

Terminal 2 Airport interchange Soekarno-Hatta Terminal 2

Bus Terminal Terminal 2 Airport Bus Terminal

Integrated Building SHIA

Mainline rail interchange Soekarno–Hatta Airport Rail Link

Terminal 1 Terminal Station

Airport interchange Soekarno-Hatta Terminal 1

Future expansion

Skytrain passengers

The Skytrain will be extended to planned new Terminal 4 and Sky Hub (commercial area) in Phase 2. Then it will be connected to Integrated Building Terminal, Terminal 1, 2 and 3.