Three Oaks railway station

Three Oaks
National Rail
The platform at Three Oaks station, looking north
General information
Location Three Oaks, Rother
England
Coordinates 50°54′01″N 0°36′49″E
Grid reference TQ838144
Managed by Southern
Platforms 1
Other information
Station code TOK
Classification DfT category F2
History
Opened 1 July 1907
Original company South Eastern Railway
Pre-grouping South Eastern and Chatham Railway
Post-grouping Southern Railway
Key dates
1 July 1907 Opened as Three Oaks Bridge Halt
1909 Renamed Three Oaks Halt
? Renamed Three Oaks and Guestling Halt
5 May 1969 Renamed Three Oaks and Guestling
12 May 1980 Renamed Three Oaks
Passengers
2018/19 Increase 11,534
2019/20 Increase 12,672
2020/21 Decrease 3,914
2021/22 Increase 8,952
2022/23 Increase 12,196
Notes
Passenger statistics from the Office of Rail and Road

Three Oaks railway station serves the village of Three Oaks in East Sussex, England. It is on the Marshlink Line, and train services are provided by Southern. It was originally known as Three Oaks & Guestling.

History

The railway line between Ashford and Hastings was opened by the South Eastern Railway in 1851, but originally there were no stations between Winchelsea and Hastings. Ore opened in 1888, and with the introduction of steam railmotor services between Rye and Hastings, three halts were opened between Winchelsea and Ore on 1 July 1907: Snailham Crossing Halt; Guestling Halt; and Three Oaks Bridge Halt. The latter station has been renamed four times: in 1909 it became Three Oaks Halt; later on it became Three Oaks and Guestling Halt; on 5 May 1969 Three Oaks and Guestling; finally on 12 May 1980 the present name of Three Oaks was adopted.

Description

The station has a single platform from which trains depart to Ashford International and Eastbourne via Hastings. The line was singled in 1979, with all trains using the one-time westbound platform, the eastbound platform remaining in situ, albeit in a decaying state.

The platform can only accommodate a single carriage, meaning that passengers wishing to disembark must travel in the front carriage of the train.

There is a ticket issuing facility accepting card payments available here and a customer help point with on-screen customer information.

Services

The typical off-peak service at Three Oaks is one train per hour each way between Eastbourne (via Hastings) and Ashford International. All services are operated by Southern using Class 171 DMUs.

Service history

Until 2005 the station was served by hourly services each way between Ashford International and Hastings. However, in the 2005 timetable change, trains on the line were extended to run to/from Brighton (via Eastbourne and Lewes) and operated as express services; as a result, service frequency at Three Oaks (as well as neighbouring Doleham and Winchelsea) was greatly reduced, to just 3 trains per day each way. This led to the creation of a campaign the by Three Oaks and Winchelsea Action for Rail Transport (THWART) and the Marshlink Line Action Group (MLAG), which aimed to restore regular services from these stations.

This campaign was successful, and from December 2010 the weekday and Saturday service frequency at Three Oaks and Winchelsea was increased to 1 train every 2 hours each way (with services calling alternately at each station), plus a few additional stopping services during the peaks. The Sunday frequency has also been two-hourly each way since December 2015. In May 2018, the Brighton express services were replaced by stopping services to/from Eastbourne.

The May 2023 timetable change saw hourly services fully restored, with all trains now calling at both Three Oaks and Winchelsea 7 days a week.

Preceding station National Rail National Rail Following station
Ore   Southern
  Doleham or Winchelsea