TCG Anadolu

TCG Anadolu conducting naval exercises in the Mediterranean Sea, August 2023
History
Turkey
Name Anadolu
Namesake Anatolia
Ordered 1 June 2015
Builder Sedef Shipbuilding, Inc.
Laid down 7 February 2018
Launched 30 April 2019
Commissioned 10 April 2023
Identification Pennant number: L-400
Status In active service
General characteristics
Class and type Juan Carlos I-class amphibious assault ship-aircraft carrier
Displacement
  • 27,436 tons ("amphibious assault ship" configuration)
  • 24,660 tons ("V/STOL aircraft carrier" configuration)
Length 232 m (761 ft 2 in)
Beam 32 m (105 ft 0 in)
Height 58 m (190 ft 3 in)
Depth 27.5 m (90 ft 3 in)
Propulsion
Speed
  • Maximum speed: 21 knots (39 km/h; 24 mph)
  • Cruise speed: 16 knots (30 km/h; 18 mph)
Range 9,000 nautical miles (17,000 km; 10,000 mi) at 16 knots (30 km/h; 18 mph)
Endurance 50 days 30 days without replenishment
Boats & landing
craft carried
6 xType LCVP
Capacity
Complement 1223 (371 naval officers and seamen, 50 naval aviation personnel, 50 hospital personnel, 550-700 amphibious marines, others)
Sensors and
processing systems
SMART-S Mk.2 S-band 3D radar, SPN-720 Naval Precision Approach Radar, GENESIS-ADVENT Combat Management System, IRST, IFF, TDL, VMF, SATCOM, LWR, DDS, Torpedo Defense System, Aselsan Piri-100 Infrared Search and Tracking System
Armament
Aircraft carried
  • 30 Helicopters
  • UCAV (30 to 50)

TCG Anadolu (L-400) is an amphibious assault ship of the Turkish Navy. It is named after the peninsula of Anatolia (Turkish: Anadolu) which forms the majority of the land mass of Turkey. The construction works began on 30 April 2016 at the shipyard of Sedef Shipbuilding Inc. in Istanbul, with the keel being laid on 7 February 2018. TCG Anadolu was commissioned with a ceremony on 10 April 2023.

The vessel is intended to meet the various needs and requirements of the Turkish Armed Forces, such as sustaining long-endurance, long-distance military combat or humanitarian relief operations, while acting as a command center and flagship for the Turkish Navy.

The SedefNavantia consortium won the tender for the amphibious assault ship project of the Turkish Navy. Anadolu used the same design as that of the Spanish ship Juan Carlos I. All of the ship's weapon systems were procured by Turkish firms Aselsan and Havelsan. The ship features a Turkish combat management system, the GENESIS-ADVENT, which was integrated by Aselsan and Havelsan. Aircraft landing is assisted in all weather condition by Leonardo SPN-720 Precision Approach Radar.

Navantia provided design, technology transfer, equipment and technical assistance to Sedef Shipyard of Turkey for the design and development of Anadolu.

History

Design and specifications

A Bayraktar Kızılelma UCAV on TCG Anadolu

In December 2013, the Turkish LPD/LHD program was originally estimated to cost 375 million ($500 million). According to the original plan, the Turkish Navy wanted a slightly shorter flight deck without the ski-jump ramp in front, to be optimized for use with only helicopters.

The Turkish Navy later changed its plan and opted for a fully equipped flight deck with the ski-jump ramp in front, after deciding to purchase F-35B STOVL aircraft. Turkey was a Level 3 partner in the Joint Strike Fighter program that led to the F-35 Lightning II. The Turkish Air Force was intending to get the F-35A CTOL version, until the U.S. Senate blocked the export of the fighter jet to Turkey due to its purchase of the S-400 missile system from Russia, which is subjected to CAATSA sanctions. Instead of the F-35B STOVL version, in the short term the Turkish Navy will operate domestically-produced UCAVs such as the Bayraktar TB3.

According to the official specifications, TCG Anadolu will be capable of operating up to 10 F-35Bs, if Turkey purchases the aircraft in the future, and 12 medium-sized helicopters in the "V/STOL aircraft carrier" configuration.

The dimensions of the final design are 231 meters (757 ft 10 in) in length, a 32-meter (105 ft 0 in) beam, a 6.8-meter (22 ft 4 in) draft, and 58 meters (190 ft 3 in) in height. Its displacement will be 24,660 tons in "V/STOL aircraft carrier" mission configuration, or 27,079 tons in "amphibious assault ship" mission configuration. Its maximum speed will be 21.5 knots (39.8 km/h; 24.7 mph) in "STOVL aircraft carrier" configuration, or 29 knots (54 km/h; 33 mph) in "amphibious assault ship" configuration. Its maximum range will be 9,000 nautical miles (17,000 km; 10,000 mi) at an economical speed.

Amphibious assault ship configuration

The ship has a 1,880 m2 (20,200 sq ft) light cargo garage for TEU containers and 27 Amphibious Assault Vehicles (AAV); a 1,165 m2 (12,540 sq ft) dock which can host four Landing Craft Mechanized (LCM) or two Landing Craft Air Cushion (LCAC), or two Landing Craft Vehicle Personnel (LCVP); and a 1,410 m2 (15,200 sq ft) garage for heavy loads, which can host 29 main battle tanks (MBT), Amphibious Assault Vehicles, and TEU containers. The ship will be protected by the ARAS-2023 diver detection sonar (DDS). It will have a crew of 261 personnel: 30 officers, 49 NCOs, 59 leading seamen, and 123 ratings.

V/STOL aircraft carrier configuration

The ship has a 5,440 m2 (58,600 sq ft) flight deck and a 990 m2 (10,700 sq ft) aviation hangar which can accommodate either 12 medium-sized helicopters or 8 Boeing CH-47F Chinook heavy-lift helicopters. When the aviation hangar and the light cargo garage are unified, the ship can carry up to 25 medium-sized helicopters. Alternatively, the ship can carry up to 10 F-35B STOVL fighter jets and 12 medium-sized helicopters, with the possibility of hosting six more helicopters on the flight deck of the ship.

Construction and commissioning

The final contract for the construction of the ship was signed with the Navantia-Sedef consortium on 7 May 2015. The commissioning of the ship was initially scheduled for 2021, and the estimated cost of the ship according to the final specifications was declared as $1 billion in 2015. The construction works began on 30 April 2016 at the shipyard of Sedef Shipbuilding Inc. in Istanbul.

A small area in the forward of the ship caught fire whilst in dry dock on the evening of 29 April 2019, but the fire was quickly extinguished and the minor damage on the coating paint (stains of smoke and flames) was subsequently repaired with a fresh repainting.

On 27 February 2022, the sea trials of TCG Anadolu began.

TCG Anadolu was commissioned with a ceremony, attended by President Erdoğan, on 10 April 2023.

The construction of a sister ship, to be named TCG Trakya, is being planned by the Turkish Navy.