Silver Line (Delhi Metro)

Golden Line
(Line 10)
Overview
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
Termini
Stations16
Elevated: 4
Underground: 12
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned openingMarch 2026
Technical
Line length25.82 km (16.04 mi)
CharacterUnderground and elevated
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Terminal 1-IGI Airport
Indira_Gandhi_International_Airport#Terminal_1
Delhi Aerocity
Mahipalpur
Vasant Kunj
Kishangarh
Chhatarpur
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket East
Ambedkar Nagar
Khanpur
Sangam Vihar-Tigri
Maa Anandmayee Marg
Pul Pehladpur
Tughlakabad
Tughlakabad railway station

The Golden Line (Line 10) is an under-construction rapid transit line of the Delhi Metro. It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. It will start from Terminal 1-IGI Airport, which was previously planned from Delhi Aerocity, and end in Tughlakabad. It will be 25.82 km (16.04 mi) long with 16 stations, out of which four will be elevated and 12 will be underground. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.

History

The Golden Line, initially named as Silver Line, was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Silver Line would cover southern Delhi at a length of 20.2 km (12.6 mi). The plans were finalized for implementation by the Government of Delhi in December 2018; this time the length of the Silver Line increased to 23.6 km (14.7 mi). In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Silver Line began from April 2019, and was completed by three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic. Hence, construction was started by Afcons Infrastructure and Larsen & Toubro in June 2022. It was expected to be completed by 2024/25, which has been extended to March 2026, as of January 2024.

In November 2020, the DMRC changed the alignment of the Golden Line as per the instructions of the Archaeological Survey of India (ASI) to circumvent the Qutb Minar and the Mehrauli Archaeological Park, so to avoid any harm to these critical historical sites during construction and operation. As per the initial plan, the line was proposed to be extended to Terminal 1 of Indira Gandhi International Airport, in order to provide commuters a faster and direct link to the airport's premises. The proposal was approved by the Government of Delhi after the DMRC created and showed a Detailed Project Report (DPR) in December 2023, thereby increasing the line's length to 25.82 km (16.04 mi). The name of the line was changed from 'Silver Line' to 'Golden Line' in January 2024.

Stations

The stations being built on the Golden Line are:

Golden Line
No. Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Terminal 1 - IGI Airport आईजीआई एयरपोर्ट - टर्मिनल 1 4 2026 Magenta Line Underground Island None None
2 Delhi Aerocity दिल्ली एरोसिटी 4 2026 Airport Express Underground Island None None
3 Mahipalpur महिपालपुर 4 2026 Underground Side None None
4 Vasant Kunj वसंत कुंज 4 2026 Underground Side Vasant Kunj Depot At-grade
5 Kishangarh किशनगढ़ 4 2026 Underground Side None None
6 Chhatarpur छत्तरपुर 4 2026 Yellow Line Underground Side None None
7 Chhatarpur Mandir छत्तरपुर मंदिर 4 2026 Underground Island None None
8 IGNOU इग्नू 4 2026 Underground Island None None
9 Neb Sarai नेब सराय 4 2026 Underground Island None None
10 Saket East साकेत पूर्व 4 2026 Brown Line
(Phase 4 - Proposed)
Elevated Side None None
11 Ambedkar Nagar अम्बेडकर नगर 4 2026 Elevated Side None None
12 Khanpur ख़ानपुर 4 2026 Elevated Side None None
13 Sangam Vihar - Tigri संगम विहार - तिगड़ी 4 2026 Elevated Side None None
14 Maa Anandmayee Marg माँ आनंदमयी मार्ग 4 2026 Underground Island None None
15 Pul Pehladpur पुल पहलादपुर 4 2026 Underground Island None None
16 Tughlakabad Station तुग़लक़ाबाद स्टेशन 4 2026 Violet Line Underground Island Sarita Vihar Depot At-grade

Project timeline

  • April 2019: Land acquisition begins for the Golden Line.
  • January 2024: The name of the line was changed to 'Golden Line' from 'Silver Line' by the DMRC. It is expected to be completed by March 2026.

Train Info

Golden Line
Rakes TBD
Train Length TBD
Train Gauge 5 ft 6 in (1,676 mm) broad gauge
Electrification 25 kV 50 Hz AC through overhead catenary (OHE)
Train's Maximum Speed TBD
Train Operation Delhi Metro