Shenoy Nagar metro station
Shenoy Nagar | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Chennai Metro station | |||||||||||||||
General information | |||||||||||||||
Location | Bharathi Puram, Shenoy Nagar, Chennai, Tamil Nadu 600030 | ||||||||||||||
Coordinates | 13.078799°N 80.225093°E / 13.078799; 80.225093 | ||||||||||||||
Owned by | Chennai Metro | ||||||||||||||
Operated by | Chennai Metro Rail Limited (CMRL) | ||||||||||||||
Line(s) | Green Line Inter Corridor Line | ||||||||||||||
Platforms |
Island platform Platform-1 → St. Thomas Mount Platform-2 → M.G.R Chennai Central |
||||||||||||||
Tracks | 2 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Underground, Double Track | ||||||||||||||
Depth | 18 metres (59 ft) | ||||||||||||||
Parking | Available | ||||||||||||||
Bicycle facilities | Free bicycle | ||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Station code | SSN | ||||||||||||||
History | |||||||||||||||
Opened | 15 May 2017 | ||||||||||||||
Electrified | Single-phase 25 kV 50 Hz AC overhead catenary | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
Location | |||||||||||||||
Shenoy Nagar is an underground metro station on the South-East Corridor of the Green Line of Chennai Metro in Chennai, India. This was inaugurated on 14 May 2017. The station will serve the neighbourhoods of Shenoy Nagar and Aminjikarai. The station has four entry and exit points.
History
Station layout
Shenoy Nagar track layout |
||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
|
G | Street level | Exit/Entrance |
M | Mezzanine | Fare control, station agent, Ticket/token, shops |
P |
Platform 2 Northbound |
Towards → Chennai Central next station is Pachaiyappa's College |
Island platform | Doors will open on the right | ||
Platform 1 Southbound |
Towards ← St. Thomas Mount next station is Anna Nagar East |
Shenoy Nagar metro station | |
---|---|
General information | |
Status | Completed |
Type | Metro station |
Location | Shenoy Nagar |
Town or city | Chennai |
Country | India |
Construction started | 2011 |
Completed | 2017 |
Opened | 15 May 2017 |
Inaugurated | 14 May 2017 |
Design and construction | |
Main contractor | L&T-SUCG JV |
Other information | |
Parking | available |
Website | |
http://chennaimetrorail.org/ |
Facilities
List of available ATM at Shenoy Nagar metro station are
Connections
Entry/Exit
Shenoy Nagar metro station Entry/exits | ||||
---|---|---|---|---|
Gate No-A1 | Gate No-A2 | Gate No-A3 | Gate No-A4 | |