Shahpur metro station
Shahpur | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Ahmedabad Metro station | |||||||||||
General information | |||||||||||
Location | Old City, Halim Ni Khadki, Shahpur, Ahmedabad, Gujarat 380004 | ||||||||||
Coordinates | 23.03920°N 72.58124°E / 23.03920; 72.58124 | ||||||||||
Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||
Operated by | Ahmedabad Metro | ||||||||||
Line(s) | Blue Line | ||||||||||
Platforms | Side platform Platform-1 → Vastral Gam Platform-2 → Thaltej Gam | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Operational | ||||||||||
History | |||||||||||
Opening | 30 September 2022 | ||||||||||
Electrified | 750 V DC third rail | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Shahpur is an underground metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of the main Ahmedabad Urban Healthcare Centre along with Madhupur Police station.
Phase 1 of the metro was opened to the public on 30 September 2022.
Station layout
Shahpur track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
|
G | Street level | Exit/ Entrance |
M | Mezzanine | Fare control, station agent, Ticket/token, shops |
P | Platform 1 Eastbound |
Towards → Vastral Gam next station is Gheekanta |
Island platform | Doors will open on the right | ||
Platform 2 Westbound |
Towards ← Thaltej next station is Old High Court Change at the next station for Red Line |