Roki Tunnel

Roki Tunnel
South portal
South portal
Roki Tunnel is located in Georgia
Roki Tunnel
Overview
Other name(s) Roksky Tunnel
Location South Ossetia, Georgia North Ossetia, Russia
Status active
Route Transcaucasian Highway
Crosses Roki Pass
Operation
Opened 1984
Closed 2010
Rebuilt 2010-2015
Reopened 2015
Technical
Length 3,730 m (12,240 ft)
No. of lanes 2
Tunnel clearance 4.75 m (15.6 ft)
Width 7.5 m (25 ft)

The Roki Tunnel (also called Roksky Tunnel, Georgian: როკის გვირაბი; Ossetian: Ручъы тъунел; Russian: Рокский туннель) is a mountain tunnel of the Transkam road through the Greater Caucasus Mountains, north of the village Upper Roka. It is the only road joining North Ossetia–Alania in Russia into South Ossetia, a breakaway republic of Georgia. The road is manned at the town of Nizhny Zaramag in North Ossetia and is sometimes referred to as the Roki-Nizhny Zaramag border crossing.

The tunnel, completed by the Soviet government in 1984, is one of only a handful of routes that cross the North Caucasus Range. It is at about 2,000 metres (6,600 ft) altitude and its length is 3,730 metres (12,240 ft), and near the Roki Pass at about 3,000 metres (9,800 ft) altitude, which can only be used in summer. The other routes between Georgia and Russia include the Kazbegi–Verkhni Lars customs checkpoint on the Georgian Military Road, closed June 2006  and reopened 2010, and the GantiadiAdler crossing in Abkhazia which Georgia asserts functions illegally.

The tunnel has been important throughout the Georgian–Ossetian conflict. The South Ossetian authorities use tolls levied on tunnel traffic as one of their main sources of revenue. The Georgian government, backed by the United States, has long called for the South Ossetian side of the tunnel to be placed under the control of international monitors, rather than by the South Ossetian secessionists and their Russian allies.

When the Russian authorities blocked the Kazbegi-Verkhni Lars customs checkpoint between June 2006 and March 2010, the Roki Tunnel was the only available road route from Russia to South Ossetia. The tunnel was also used as a supply route for the Russian troops during the 2008 Russo-Georgian War.

Map of Georgia showing Zemo Roka
Map of South Ossetia, showing the location of the Roki Tunnel

The tunnel was reconstructed due to damage caused by Russo-Georgian War. Reconstruction took two and half years and was finished in October 2015.

See also