North Strathfield railway station

North Strathfield
Northbound view in 2022
General information
Location Queen Street, North Strathfield
Coordinates 33°51′32″S 151°05′17″E
Elevation 19 metres (62 ft)
Owned by Transport Asset Holding Entity
Operated by Sydney Trains
Line(s) Main Northern
Distance 13.38 kilometres from Central
Platforms 3 (1 island, 1 side)
Tracks 4
Construction
Structure type Ground
Accessible Yes
Other information
Station code NST
Website Transport for NSW
History
Opened 9 June 1918
Electrified Yes
Passengers
2013 2,590 (daily) (Sydney Trains)
Rank 96
Services
Preceding station Sydney Trains Following station
Concord West
towards Hornsby
Northern Line Strathfield
towards Gordon via Central
Future service
Preceding station Sydney Metro Following station
Olympic Park
towards Westmead
Sydney Metro West Burwood North
towards Hunter Street

North Strathfield railway station is located on the Main Northern line, serving the Sydney suburbs of North Strathfield, North Homebush and Concord West. It is served by Sydney Trains T9 Northern Line services.

History

The Homebush to Hornsby section of the Main North railway line was first opened in 1886, and a connection from the Main North railway line to Strathfield to the east was subsequently added. North Strathfield station was added to the line much later: it opened on 9 June 1918 as an island platform with two faces. In 1924, a third platform was added on the western side. Added to the line much later It is now the first station on the Main Northern line after it branches from the Main Suburban line at Strathfield.

Today, the primary, eastern, connection between the Main Northern and Main Suburban lines is from North Strathfield and Strathfield, but the single track western connection between North Strathfield and Homebush still exists. This connection is mainly used by freight trains but is occasionally used by passenger trains travelling to Olympic Park station during trackwork or for major events at Sydney Olympic Park.

To the east of the station lies a passing loop. This had been taken out of use, but in June 2015 was recommissioned as part of the construction of a dive south of the station as part of the Northern Sydney Freight Corridor project.

As part of the proposed Sydney Metro West project, a further two platforms will be built.

The station was upgraded and given lifts in November 2019.

Platforms and services

Platform Line Stopping pattern Notes
1 Southbound services to Gordon via Strathfield & North Sydney
2 Northbound services to Hornsby
3 2 morning peak and 16 afternoon peak services to Hornsby
Entrance