List of Falcon 9 first-stage boosters
A Falcon 9 first-stage booster is a reusable rocket booster used on the Falcon 9 and Falcon Heavy orbital launch vehicles manufactured by SpaceX. The manufacture of first-stage booster constitutes about 60% of the launch price of a single expended Falcon 9 (and three of them over 80% of the launch price of an expended Falcon Heavy), which led SpaceX to develop a program dedicated to recovery and reuse of these boosters for a significant decrease in launch costs. After multiple attempts, some as early as 2010, at controlling the reentry of the first stage after its separation from the second stage, the first successful controlled landing of a first stage occurred on 22 December 2015, on the first flight of the Full Thrust version. Since then, Falcon 9 first-stage boosters have been landed and recovered 268 times out of 279 attempts, including synchronized recoveries of the side-boosters of most Falcon Heavy flights. One of the Falcon Heavy center boosters landed softly but it was severely damaged during transport, and one mission, ViaSat-3, had the rocket’s side and center boosters fully expended, which makes it the first time that all of the boosters were expended.
In total 41 recovered boosters have been refurbished and subsequently flown at least a second time, with a record of 19 missions. SpaceX intentionally limited Block 3 and Block 4 boosters to flying only two missions each, but the company indicated in 2018 that they expected the Block 5 versions to achieve ten flights, each with only minor refurbishment. This milestone was first achieved by Booster B1051 on the Starlink-27 mission in 2021.
All boosters in Block 4 and earlier have been retired, expended, or lost. The last flight of a Block 4 booster was in June 2018. Since then all boosters in the active fleet are Block 5.
Booster names are a B followed by a four-digit number. The first Falcon 9 version, v1.0, had boosters B0001 to B0007. All following boosters were numbered sequentially starting at B1001, the number 1 standing for first-stage booster.
List of boosters
v1.0 and v1.1
These boosters were the first two major versions of the Falcon 9. These boosters looked very different from the more recent models. They were much smaller and had much less power. On the maiden flight and second flight of V 1.0, SpaceX included basic recovery hardware (parachutes) to try and recover the booster. However, as the boosters broke up on re-entry due to aerodynamic forces both times, SpaceX gave up on parachutes and decided to pursue propulsive landings instead. First came some controlled water landings, then came the attempts on the drone ship "Just Read the Instructions 1". None of these boosters were recovered or survived landing after an orbital launch. Two test devices made several short flights each.
S/N | Version | Launch date (UTC) | Flight No. | Payload | Launch | Landing | Status |
---|---|---|---|---|---|---|---|
B0001 | v1.0 test | Manufactured in 2007 | — | N/A | — | — | — |
B0002 | v1.0 test |
September 2012–October 2013 (8 test flights) |
— | N/A | Suborbital | 8 test landings achieved | Retired |
B0003 | v1.0 | 4 June 2010 | F9-001 | Dragon Spacecraft Qualification Unit | Success (40) | Failure (ocean splashdown) | Destroyed |
B0004 | v1.0 | 8 December 2010 | F9-002 | Dragon C101 (COTS Demo Flight 1) | Success (40) | Failure (ocean splashdown) | Destroyed |
B0005 | v1.0 | 22 May 2012 | F9-003 | Dragon C102 (COTS Demo Flight 2) | Success (40) | No attempt | Expended |
B0006 | v1.0 | 8 October 2012 | F9-004 | Dragon C103 (CRS-1) | Partial success (40) | No attempt | Expended |
B0007 | v1.0 | 1 March 2013 | F9-005 | Dragon C104 (CRS-2) | Success (40) | No attempt | Expended |
B1001 | v1.1 test | Manufactured in 2012 | — | N/A | — | — | — |
B1002 | v1.1 test |
April–August 2014 (5 test flights) |
— | N/A | Suborbital | 4 test landings achieved | Destroyed |
B1003 | v1.1 | 29 September 2013 | F9-006 | CASSIOPE | Success (4E) | Failure (ocean splashdown) | Destroyed |
B1004 | v1.1 | 3 December 2013 | F9-007 | SES-8 | Success (40) | No attempt | Expended |
B1005 | v1.1 | 6 January 2014 | F9-008 | Thaicom 6 | Success (40) | No attempt | Expended |
B1006 | v1.1 | 18 April 2014 | F9-009 | Dragon C105 (CRS-3) | Success (40) | Controlled (ocean) | Expended |
B1007 | v1.1 | 14 July 2014 | F9-010 | Orbcomm OG2 × 6 | Success (40) | Controlled (ocean) | Expended |
B1008 | v1.1 | 5 August 2014 | F9-011 | AsiaSat 8 | Success (40) | No attempt | Expended |
B1009 | v1.1 test | Manufactured in 2014 | — | N/A | — | — | Never completed |
B1010 | v1.1 | 21 September 2014 | F9-013 | Dragon C106 (CRS-4) | Success (40) | Failure (ocean splashdown) | Destroyed |
B1011 | v1.1 | 7 September 2014 | F9-012 | AsiaSat 6 / Thaicom 7 | Success (40) | No attempt | Expended |
B1012 | v1.1 | 10 January 2015 | F9-014 | Dragon C107 (CRS-5) | Success (40) | Failure | Destroyed |
B1013 | v1.1 | 11 February 2015 | F9-015 | DSCOVR | Success (40) | Controlled (ocean) | Expended |
B1014 | v1.1 | 2 March 2015 | F9-016 | ABS-3A / Eutelsat 115 West B | Success (40) | No attempt | Expended |
B1015 | v1.1 | 14 April 2015 | F9-017 | Dragon C108 (CRS-6) | Success (40) | Failure | Destroyed |
B1016 | v1.1 | 27 April 2015 | F9-018 | TürkmenÄlem 52°E / MonacoSAT | Success (40) | No attempt | Expended |
B1017 | v1.1 | 17 January 2016 | F9-021 | Jason-3 | Success (4E) | Failure | Destroyed |
B1018 | v1.1 | 28 June 2015 | F9-019 | Dragon C109 (CRS-7) | Failure (40) | Precluded | Destroyed |
|
Full Thrust up to Block 4
Falcon 9 Full Thrust (or sometimes called Falcon 9 version 1.2) was the first version of the Falcon 9 to successfully land. Changes included a larger fuel tank, uprated engines and supercooled propellant and oxidizer to increase performance. Five different versions of Full Thrust have been produced, Block 1 to 4 (all retired) are found in this list while the active Block 5 is listed separately. Block 4 was a test version that included new hardware like titanium grid fins later used for the next and final major version of the Falcon 9, Block 5. Flights of all Falcon 9 rockets up to Block 4 were limited to 2 flights only, with a total of 14 second flights of these variants. The boosters were either retired or expended after that second launch.
Since no data is provided, Falcon 9 boosters listed as simply "FT" (Full Thrust) denote Blocks 1 to 3, while Block 4 is listed as "FT Block 4". All boosters are Falcon 9 variants, unless otherwise noted. Boosters B1023 and B1025 were Falcon 9 boosters, which were converted to Falcon Heavy side boosters for the Falcon Heavy test flight.
S/N | Version | Launch date (UTC) | Flight No. | Turnaround | Payload | Launch | Landing | Status |
---|---|---|---|---|---|---|---|---|
B1019 | FT | 22 December 2015 | F9-020 | — | Orbcomm OG2 × 11 | Success (40) |
Success (LZ-1) |
Retired Permanent display outside of SpaceX headquarters (since August 2016) |
B1020 | FT | 4 March 2016 | F9-022 | — | SES-9 | Success (40) |
Failure | Destroyed |
B1021 | FT | 8 April 2016 | F9-023 | — | Dragon C110 (CRS-8) | Success (40) |
Success (OCISLY) |
Retired On display outdoors at Dish Network Headquarters in Littleton, Colorado (since October 2023) Previously displayed in Hangar E, Cape Canaveral Space Force Station |
30 March 2017 | F9-032 ♺ | 356 days | SES-10 | Success (39A) |
Success (OCISLY) |
|||
B1022 | FT | 6 May 2016 | F9-024 | — | JCSAT-14 | Success (40) |
Success (OCISLY) |
Retired |
B1023 | FT | 27 May 2016 | F9-025 | — | Thaicom 8 | Success (40) |
Success (OCISLY) |
Retired On display at Kennedy Space Center Visitor Complex (since June 2022) |
FH side | 6 February 2018 | FH-001 ♺ | 620 days | Tesla Roadster | Success (39A) |
Success (LZ-1) |
||
B1024 | FT | 15 June 2016 | F9-026 | — | ABS-2A / Eutelsat 117 West B | Success (40) |
Failure | Destroyed |
B1025 | FT | 18 July 2016 | F9-027 | — | Dragon C111 (CRS-9) | Success (40) |
Success (LZ-1) |
Retired |
FH side | 6 February 2018 | FH-001 ♺ | 568 days | Tesla Roadster | Success (39A) |
Success (LZ-2) |
||
B1026 | FT | 14 August 2016 | F9-028 | — | JCSAT-16 | Success (40) |
Success (OCISLY) |
Retired |
B1027 | FH test | Manufactured in 2016 | — | — | — | — | — | — |
B1028 | FT | 3 September 2016 | — | — | AMOS-6 | Precluded | Precluded | Destroyed |
B1029 | FT | 14 January 2017 | F9-029 | — | Iridium NEXT × 10 (NEXT-1) | Success (4E) |
Success (JRTI) |
Retired |
23 June 2017 | F9-036 ♺ | 160 days | BulgariaSat-1 | Success (39A) |
Success (OCISLY) |
|||
B1030 | FT | 16 March 2017 | F9-031 | — | EchoStar 23 | Success (39A) |
No attempt | Expended |
B1031 | FT | 19 February 2017 | F9-030 | — | Dragon C112 (CRS-10) | Success (39A) |
Success (LZ-1) |
Retired |
11 October 2017 | F9-043 ♺ | 234 days | SES-11 | Success (39A) |
Success (OCISLY) |
|||
B1032 | FT | 1 May 2017 | F9-033 | — | USA-276 (NROL-76) | Success (39A) |
Success (LZ-1) |
Expended |
31 January 2018 | F9-048 ♺ | 275 days | GovSat-1 / SES-16 | Success (40) |
Controlled (ocean) | |||
B1033 | FH core | 6 February 2018 | FH-001 | — | Tesla Roadster | Success (39A) |
Failure | Destroyed |
B1034 | FT | 15 May 2017 | F9-034 | — | Inmarsat-5 F4 | Success (39A) |
No attempt | Expended |
B1035 | FT | 3 June 2017 | F9-035 | — | Dragon C106 (CRS-11) | Success (39A) |
Success (LZ-1) |
Retired On display outdoors at Space Center Houston (since March 2020) |
15 December 2017 | F9-045 ♺ | 195 days | Dragon C108 (CRS-13) | Success (40) |
Success (LZ-1) |
|||
B1036 | FT | 25 June 2017 | F9-037 | — | Iridium NEXT × 10 (NEXT-2) | Success (4E) |
Success (JRTI) |
Expended |
23 December 2017 | F9-046 ♺ | 181 days | Iridium NEXT × 10 (NEXT-4) | Success (4E) |
Controlled (ocean) | |||
B1037 | FT | 5 July 2017 | F9-038 | — | Intelsat 35e | Success (39A) |
No attempt | Expended |
B1038 | FT | 24 August 2017 | F9-040 | — | Formosat-5 | Success (4E) |
Success (JRTI) |
Expended |
22 February 2018 | F9-049 ♺ | 182 days | Paz | Success (4E) |
No attempt | |||
B1039 | FT Block 4 | 14 August 2017 | F9-039 | — | Dragon C113 (CRS-12) | Success (39A) |
Success (LZ-1) |
Expended |
2 April 2018 | F9-052 ♺ | 231 days | Dragon C110 (CRS-14) | Success (40) |
No attempt | |||
B1040 | FT Block 4 | 7 September 2017 | F9-041 | — | Boeing X-37B (OTV-5) | Success (39A) |
Success (LZ-1) |
Expended |
4 June 2018 | F9-056 ♺ | 270 days | SES-12 | Success (40) |
No attempt | |||
B1041 | FT Block 4 | 9 October 2017 | F9-042 | — | Iridium NEXT × 10 (NEXT-3) | Success (4E) |
Success (JRTI) |
Expended |
30 March 2018 | F9-051 ♺ | 172 days | Iridium NEXT × 10 (NEXT-5) | Success (4E) |
No attempt | |||
B1042 | FT Block 4 | 30 October 2017 | F9-044 | — | Koreasat 5A | Success (39A) |
Success (OCISLY) |
Retired |
B1043 | FT Block 4 | 8 January 2018 | F9-047 | — | Zuma | Success (40) |
Success (LZ-1) |
Expended |
22 May 2018 | F9-055 ♺ | 134 days | Iridium NEXT × 5 (NEXT-6) / GRACE-FO × 2 | Success (4E) |
No attempt | |||
B1044 | FT Block 4 | 6 March 2018 | F9-050 | — | Hispasat 30W-6 | Success (40) |
No attempt | Expended |
B1045 | FT Block 4 | 18 April 2018 | F9-053 | — | TESS | Success (40) |
Success (OCISLY) |
Expended |
29 June 2018 | F9-057 ♺ | 72 days | Dragon C111 (CRS-15) | Success (40) |
No attempt | |||
|
Block 5
There are three booster types: Falcon 9 (F9), Falcon Heavy core (FH core) boosters, and Falcon Heavy side (FH side) boosters. Falcon 9 and Falcon Heavy side boosters are reconfigurable to each other. A Falcon Heavy core booster is manufactured with structural supports for the side boosters and cannot be converted to a Falcon 9 booster or Falcon Heavy side booster. The interstage mounting hardware was changed after B1056. The newer interstage design features fewer pins holding the interstage on, reducing the amount of work needed to convert a Falcon 9 booster to a Falcon Heavy side booster.
Block 5 is the latest iteration of the Falcon 9 and Falcon Heavy boosters. Changes include a stronger heat shield, upgraded engines, new carbon composite sections (landing legs, engine sections, raceways, RCS thrusters and interstage), retractable landing legs, titanium grid fins, and other additions that simplify refurbishment and allow for easier reusability.
Block 5 boosters were initially certified for 10 launches which was increased to 15. A "deep-dive" examination has been performed on Falcon 9 B1058 and B1060 after their 15th flight, and SpaceX certified Falcon 9 boosters for 20 missions. SpaceX is currently planning to further increase the Falcon re-flight certification to 40 flights per booster, once 20 flights is reached.
B1058, first launched on 30 May 2020 (Crew Dragon Demo-2), was a veteran Guinness Book of World Records holder Falcon 9 booster and the only booster with NASA logos. On 11 September 2022, during a Starlink mission, it became the first to complete fourteen launches and landings to become the fleet leader. With another 5 Starlink missions, B1058 achieved 15, 16, 17, 18 & 19 launches and landings, the first to do so. Amongst all B5 boosters, it is the booster with most spacecrafts (869) launched to orbit and along with the record for most spacecraft mass launched to orbit by a single booster, that is, of ~262,000 kg (578,000 lb). B1060 is the oldest and earliest launched of the active Falcon 9 boosters.
As of 4 January 2024, SpaceX used a total of 37 new B5 boosters, of which 20 are no longer active (thirteen have been expended and five have been lost due to failed landings and two being lost during recovery).
Inactive or lost
S/N | Type | Launches | Launch date (UTC) | Flight No. | Turnaround time | Payload | Launch (pad) |
Landing (location) |
Status |
---|---|---|---|---|---|---|---|---|---|
B1046 | F9 | 4 | 11 May 2018 | F9-054 | — | Bangabandhu-1 | Success (39A) | Success (OCISLY) | Expended |
7 August 2018 | F9-060 ♺ | 88 days | Telkom-4 Merah Putih | Success (40) | Success (OCISLY) | ||||
3 December 2018 | F9-064 ♺ | 118 days | SHERPA (SSO-A) | Success (4E) | Success (JRTI) | ||||
19 January 2020 | F9-079 ♺ | 412 days | Dragon C205 (In-Flight Abort Test) | Success (39A) | No attempt | ||||
B1047 | F9 | 3 | 22 July 2018 | F9-058 | — | Telstar 19V | Success (40) | Success (OCISLY) | Expended |
15 November 2018 | F9-063 ♺ | 116 days | Es'hail 2 | Success (39A) | Success (OCISLY) | ||||
6 August 2019 | F9-074 ♺ | 263 days | AMOS-17 | Success (40) | No attempt | ||||
B1048 | F9 | 5 | 25 July 2018 | F9-059 | — | Iridium NEXT × 10 (NEXT-7) | Success (4E) | Success (JRTI) | Destroyed during landing failure |
8 October 2018 | F9-062 ♺ | 75 days | SAOCOM 1A | Success (4E) | Success (LZ‑4) | ||||
22 February 2019 | F9-068 ♺ | 137 days | Nusantara Satu / Beresheet | Success (40) | Success (OCISLY) | ||||
11 November 2019 | F9-075 ♺ | 262 days | Starlink × 60 (v1.0 L1) | Success (40) | Success (OCISLY) | ||||
18 March 2020 | F9-083 ♺ | 128 days | Starlink × 60 (v1.0 L5) | Success (39A) | Failure (OCISLY) | ||||
B1049 | F9 | 11 | 10 September 2018 | F9-061 | — | Telstar 18V / Apstar 5C | Success (40) | Success (OCISLY) | Expended |
11 January 2019 | F9-067 ♺ | 123 days | Iridium NEXT × 10 (NEXT-8) | Success (4E) | Success (JRTI) | ||||
24 May 2019 | F9-071 ♺ | 133 days | Starlink × 60 (v0.9) | Success (40) | Success (OCISLY) | ||||
7 January 2020 | F9-078 ♺ | 228 days | Starlink × 60 (v1.0 L2) | Success (40) | Success (OCISLY) | ||||
4 June 2020 | F9-086 ♺ | 149 days | Starlink × 60 (v1.0 L7) | Success (40) | Success (JRTI) | ||||
18 August 2020 | F9-091 ♺ | 75 days | Starlink × 58 (v1.0 L10) | Success (40) | Success (OCISLY) | ||||
25 November 2020 | F9-100 ♺ | 99 days | Starlink × 60 (v1.0 L15) | Success (40) | Success (OCISLY) | ||||
4 March 2021 | F9-109 ♺ | 99 days | Starlink × 60 (v1.0 L17) | Success (39A) | Success (OCISLY) | ||||
4 May 2021 | F9-116 ♺ | 61 days | Starlink × 60 (v1.0 L25) | Success (39A) | Success (OCISLY) | ||||
14 September 2021 | F9-125 ♺ | 133 days | Starlink × 51 (Group 2-1) | Success (4E) | Success (OCISLY) | ||||
23 November 2022 | F9-186 ♺ | 435 days | Eutelsat 10B | Success (40) | No attempt | ||||
B1050 | F9 | 1 | 5 December 2018 | F9-065 | — | Dragon C112 (CRS-16) | Success (40) | Failure (LZ‑1) | Scrapped |
B1051 | F9 | 14 | 2 March 2019 | F9-069 | — | Dragon C204 (Demo-1) | Success (39A) | Success (OCISLY) | Expended |
12 June 2019 | F9-072 ♺ | 102 days | RCM × 3 | Success (4E) | Success (LZ‑4) | ||||
29 January 2020 | F9-080 ♺ | 231 days | Starlink × 60 (v1.0 L3) | Success (40) | Success (OCISLY) | ||||
22 April 2020 | F9-084 ♺ | 84 days | Starlink × 60 (v1.0 L6) | Success (39A) | Success (OCISLY) | ||||
7 August 2020 | F9-090 ♺ | 107 days | Starlink × 57 (v1.0 L9) | Success (39A) | Success (OCISLY) | ||||
18 October 2020 | F9-095 ♺ | 72 days | Starlink × 60 (v1.0 L13) | Success (39A) | Success (OCISLY) | ||||
13 December 2020 | F9-102 ♺ | 56 days | SXM 7 | Success (40) | Success (JRTI) | ||||
20 January 2021 | F9-105 ♺ | 38 days | Starlink × 60 (v1.0 L16) | Success (39A) | Success (JRTI) | ||||
14 March 2021 | F9-111 ♺ | 53 days | Starlink × 60 (v1.0 L21) | Success (39A) | Success (OCISLY) | ||||
9 May 2021 | F9-117 ♺ | 56 days | Starlink × 60 (v1.0 L27) | Success (40) | Success (JRTI) | ||||
18 December 2021 | F9-132 ♺ | 228 days | Starlink × 52 (Group 4-4) | Success (4E) | Success (OCISLY) | ||||
19 March 2022 | F9-145 ♺ | 91 days | Starlink × 53 (Group 4-12) | Success (40) | Success (JRTI) | ||||
17 July 2022 | F9-165 ♺ | 120 days | Starlink × 53 (Group 4-22) | Success (40) | Success (JRTI) | ||||
12 November 2022 | F9-185 ♺ | 118 days | Galaxy 31 & 32 | Success (40) | No attempt | ||||
B1052 | FH side | 8 | 11 April 2019 | FH-002 | — | Arabsat-6A | Success (39A) | Success (LZ‑1) | Expended |
25 June 2019 | FH-003 ♺ | 75 days | COSMIC-2 (STP-2) | Success (39A) | Success (LZ‑2) | ||||
F9 | 31 January 2022 | F9-138 ♺ | 951 days | CSG-2 | Success (40) | Success (LZ‑1) | |||
9 March 2022 | F9-144 ♺ | 37 days | Starlink × 48 (Group 4-10) | Success (40) | Success (ASOG) | ||||
18 May 2022 | F9-155 ♺ | 70 days | Starlink × 53 (Group 4-18) | Success (39A) | Success (ASOG) | ||||
4 August 2022 | F9-168 ♺ | 78 days | Danuri (KPLO) | Success (40) | Success (JRTI) | ||||
5 September 2022 | F9-174 ♺ | 32 days | Starlink x 51 (Group 4-20) | Success (40) | Success (JRTI) | ||||
FH side | 1 May 2023 | FH-006 ♺ | 238 days | ViaSat-3 Americas | Success (39A) | No attempt | |||
B1053 | FH side | 3 | 11 April 2019 | FH-002 | — | Arabsat-6A | Success (39A) | Success (LZ‑2) | Expended |
25 June 2019 | FH-003 ♺ | 75 days | COSMIC-2 (STP-2) | Success (39A) | Success (LZ‑1) | ||||
1 May 2023 | FH-006 ♺ | 1406 days | ViaSat-3 Americas | Success (39A) | No attempt | ||||
B1054 | F9 | 1 | 23 December 2018 | F9-066 | — | GPS III SV01 Vespucci | Success (40) | No attempt | Expended |
B1055 | FH core | 1 | 11 April 2019 | FH-002 | — | Arabsat-6A | Success (39A) | Success (OCISLY) | Destroyed during recovery (OCISLY) |
B1056 | F9 | 4 | 4 May 2019 | F9-070 | — | Dragon C113 (CRS-17) | Success (40) | Success (OCISLY) | Lost at sea |
25 July 2019 | F9-073 ♺ | 82 days | Dragon C108 (CRS-18) | Success (40) | Success (LZ‑1) | ||||
17 December 2019 | F9-077 ♺ | 146 days | JCSAT-18 | Success (40) | Success (OCISLY) | ||||
17 February 2020 | F9-081 ♺ | 62 days | Starlink × 60 (v1.0 L4) | Success (40) | Failure (OCISLY) | ||||
B1057 | FH core | 1 | 25 June 2019 | FH-003 | — | COSMIC-2 (STP-2) | Success (39A) | Failure (OCISLY) | Destroyed during landing failure |
B1058 |
F9 | 19 | 30 May 2020 | F9-085 | — | Dragon C206 Endeavour (Demo-2) | Success (39A) | Success (OCISLY) | Destroyed during recovery (JRTI) |
20 July 2020 | F9-089 ♺ | 51 days | ANASIS-II | Success (40) | Success (JRTI) | ||||
6 October 2020 | F9-094 ♺ | 78 days | Starlink × 60 (v1.0 L12) | Success (39A) | Success (OCISLY) | ||||
6 December 2020 | F9-101 ♺ | 60 days | Dragon C208 (CRS-21) | Success (39A) | Success (OCISLY) | ||||
24 January 2021 | F9-106 ♺ | 49 days | Transporter-1 | Success (40) | Success (OCISLY) | ||||
11 March 2021 | F9-110 ♺ | 46 days | Starlink × 60 (v1.0 L20) | Success (40) | Success (JRTI) | ||||
7 April 2021 | F9-113 ♺ | 27 days | Starlink × 60 (v1.0 L23) | Success (40) | Success (OCISLY) | ||||
15 May 2021 | F9-118 ♺ | 38 days | Starlink × 52 (v1.0 L26) | Success (39A) | Success (OCISLY) | ||||
13 November 2021 | F9-128 ♺ | 182 days | Starlink × 53 (Group 4-1) | Success (40) | Success (JRTI) | ||||
13 January 2022 | F9-136 ♺ | 61 days | Transporter-3 | Success (40) | Success (LZ‑1) | ||||
21 February 2022 | F9-141 ♺ | 39 days | Starlink x 46 (Group 4-8) | Success (40) | Success (ASOG) | ||||
6 May 2022 | F9-152 ♺ | 73 days | Starlink x 53 (Group 4-17) | Success (39A) | Success (ASOG) | ||||
7 July 2022 | F9-162 ♺ | 62 days | Starlink x 53 (Group 4-21) | Success (40) | Success (JRTI) | ||||
11 September 2022 | F9-175 ♺ | 66 days | Starlink x 34 (Group 4-2) + BlueWalker 3 | Success (39A) | Success (ASOG) | ||||
17 December 2022 | F9-192 ♺ | 97 days | Starlink x 54 (Group 4-37) | Success (39A) | Success (JRTI) | ||||
10 July 2023 | F9-238 ♺ | 205 days | Starlink v2 × 22 (Group 6-5) | Success (40) | Success (JRTI) | ||||
20 September 2023 | F9-257 ♺ | 72 days | Starlink v2 × 22 (Group 6-17) | Success (40) | Success (ASOG) | ||||
4 November 2023 | F9-269 ♺ | 45 days | Starlink v2 × 23 (Group 6-26) | Success (40) | Success (ASOG) | ||||
23 December 2023 | F9-283 ♺ | 49 days | Starlink v2 × 23 (Group 6-32) | Success (40) | Success (JRTI) | ||||
B1059 | F9 | 6 | 5 December 2019 | F9-076 | — | Dragon C106 (CRS-19) | Success (40) | Success (OCISLY) | Destroyed during landing failure |
7 March 2020 | F9-082 ♺ | 93 days | Dragon C112 (CRS-20) | Success (40) | Success (LZ‑1) | ||||
13 June 2020 | F9-087 ♺ | 98 days | Starlink × 58 (v1.0 L8) | Success (40) | Success (OCISLY) | ||||
30 August 2020 | F9-092 ♺ | 78 days | SAOCOM 1B | Success (40) | Success (LZ‑1) | ||||
19 December 2020 | F9-103 ♺ | 111 days | NROL-108 | Success (39A) | Success (LZ‑1) | ||||
16 February 2021 | F9-108 ♺ | 59 days | Starlink × 60 (v1.0 L19) | Success (40) | Failure (OCISLY) | ||||
B1066 | FH core | 1 | 1 November 2022 | FH-004 | — | USSF-44 | Success (39A) | No attempt | Expended |
B1068 | FH core | 1 | 1 May 2023 | FH-006 | — | ViaSat-3 Americas | Success (39A) | No attempt | Expended |
B1070 | FH core | 1 | 15 January 2023 | FH-005 | — | USSF-67 | Success (39A) | No attempt | Expended |
B1074 | FH core | 1 | 29 July 2023 | FH-007 | — | Jupiter-3 (EchoStar-24) | Success (39A) | No attempt | Expended |
B1079 | FH core | 1 | 13 October 2023 | FH-008 | — | Psyche | Success (39A) | No attempt | Expended |
B1084 | FH core | 1 | 29 December 2023 | FH-009 | — | USSF-52 (Boeing X-37B OTV-7) | Success (39A) | No attempt | Expended |
- means the booster has this logo on it. The logo is not being used in this table to signify that the booster is owned by NASA nor does it signify the booster is exclusively or partly used by NASA.
- Entries with colored background and ♺ symbol denote flights using refurbished boosters from previous flights.
- Mission names are presented in parentheses when applicable. indicates crewed launch under Commercial Crew Program (CCP). Adjacent logos are mission patches.
- B1048 had a Merlin engine fail during launch, meaning the engine failed to light up for entry, and the booster crashed.
- B1049 flew with a Test/Spare interstage on its last flight since it donated its interstage to B1052 after its penultimate flight.
- B1050 performed a controlled ocean landing near the coast, and was then recovered from the water and scrapped for parts.
- B1052 used the interstage from B1049 donated after that booster's penultimate flight.
- Falcon Heavy core B1055 landed safely, but later fell over on the drone ship platform during transit back to Cape Canaveral in rough seas. At the time, the engines were described as perhaps recoverable, the status of the other components of the booster was not stated.
- Despite making a successful landing, de-tanking and heading back home, the stage fell over on the drone ship platform during transit back to Cape Canaveral in rough seas, high winds and waves. This is still considered a successful landing as the stage damage occurred while in transport.
- Falcon 9 B1059 had a hole in one of its "boots" (protective thermal blankets) which lead to one of the engines catching fire and shutting down during re-entry and the booster impacted the ocean.
Active
S/N | Type | Launches | Launch date (UTC) | Flight No. | Turnaround time | Payload | Launch (pad) |
Landing (location) |
Status |
---|---|---|---|---|---|---|---|---|---|
B1060 | F9 | 17 | 30 June 2020 | F9-088 | — | GPS III SV03 Matthew Henson | Success (40) | Success (JRTI) | Awaiting Assignment |
3 September 2020 | F9-093 ♺ | 65 days | Starlink × 60 (v1.0 L11) | Success (39A) | Success (OCISLY) | ||||
24 October 2020 | F9-096 ♺ | 51 days | Starlink × 60 (v1.0 L14) | Success (40) | Success (JRTI) | ||||
8 January 2021 | F9-104 ♺ | 76 days | Türksat 5A | Success (40) | Success (JRTI) | ||||
4 February 2021 | F9-107 ♺ | 27 days | Starlink × 60 (v1.0 L18) | Success (40) | Success (OCISLY) | ||||
24 March 2021 | F9-112 ♺ | 48 days | Starlink × 60 (v1.0 L22) | Success (40) | Success (OCISLY) | ||||
29 April 2021 | F9-115 ♺ | 36 days | Starlink × 60 (v1.0 L24) | Success (40) | Success (JRTI) | ||||
30 June 2021 | F9-123 ♺ | 62 days | Transporter-2 | Success (40) | Success (LZ‑1) | ||||
2 December 2021 | F9-130 ♺ | 155 days | Starlink × 48 (Group 4-3) | Success (40) | Success (ASOG) | ||||
19 January 2022 | F9-137 ♺ | 48 days | Starlink × 49 (Group 4-6) | Success (39A) | Success (ASOG) | ||||
3 March 2022 | F9-143 ♺ | 43 days | Starlink × 47 (Group 4-9) | Success (39A) | Success (JRTI) | ||||
21 April 2022 | F9-149 ♺ | 49 days | Starlink × 53 (Group 4-14) | Success (40) | Success (JRTI) | ||||
17 June 2022 | F9-158 ♺ | 57 days | Starlink × 53 (Group 4-19) | Success (39A) | Success (ASOG) | ||||
8 October 2022 | F9-180 ♺ | 113 days | Galaxy 33 & 34 | Success (40) | Success (ASOG) | ||||
3 January 2023 | F9-195 ♺ | 87 days | Transporter-6 | Success (40) | Success (LZ‑1) | ||||
16 July 2023 | F9-239 ♺ | 194 days | Starlink x 54 (Group 5-15) | Success (40) | Success (ASOG) | ||||
24 September 2023 | F9-258 ♺ | 70 days | Starlink v2 × 22 (Group 6-18) | Success (40) | Success (JRTI) | ||||
B1061 | F9 | 18 | 15 November 2020 | F9-098 | — | Dragon C207 Resilience (Crew-1) | Success (39A) | Success (JRTI) | Refurbishing |
23 April 2021 | F9-114 ♺ | 159 days | Dragon C206 Endeavour (Crew-2) | Success (39A) | Success (OCISLY) | ||||
6 June 2021 | F9-121 ♺ | 44 days | SXM-8 | Success (40) | Success (JRTI) | ||||
29 August 2021 | F9-124 ♺ | 84 days | Dragon C208 (CRS-23) | Success (39A) | Success (ASOG) | ||||
9 December 2021 | F9-131 ♺ | 102 days | IXPE | Success (39A) | Success (JRTI) | ||||
3 February 2022 | F9-140 ♺ | 56 days | Starlink × 49 (Group 4-7) | Success (39A) | Success (ASOG) | ||||
1 April 2022 | F9-146 ♺ | 57 days | Transporter-4 | Success (40) | Success (JRTI) | ||||
25 May 2022 | F9-156 ♺ | 54 days | Transporter-5 | Success (40) | Success (LZ‑1) | ||||
19 June 2022 | F9-160 ♺ | 25 days | Globalstar FM15 | Success (40) | Success (JRTI) | ||||
12 August 2022 | F9-170 ♺ | 54 days | Starlink × 46 (Group 3-3) | Success (4E) | Success (OCISLY) | ||||
30 December 2022 | F9-194 ♺ | 140 days | EROS-C3 | Success (4E) | Success (LZ‑4) | ||||
3 March 2023 | F9-208 ♺ | 63 days | Starlink × 51 (Group 2-7) | Success (4E) | Success (OCISLY) | ||||
27 April 2023 | F9-219 ♺ | 55 days | Starlink × 46 (Group 3-5) | Success (4E) | Success (OCISLY) | ||||
31 May 2023 | F9-228 ♺ | 34 days | Starlink × 52 (Group 2-10) | Success (4E) | Success (OCISLY) | ||||
22 August 2023 | F9-248 ♺ | 83 days | Starlink v2 × 21 (Group 7-1) | Success (4E) | Success (OCISLY) | ||||
21 October 2023 | F9-265 ♺ | 60 days | Starlink v2 × 21 (Group 7-5) | Success (4E) | Success (OCISLY) | ||||
1 December 2023 | F9-278 ♺ | 41 days | 425 Project (and EIRSAT-1) | Success (4E) | Success (LZ‑4) | ||||
14 January 2024 | F9-289 ♺ | 44 days | Starlink v2 × 22 (Group 7-10) | Success (4E) | Success (OCISLY) | ||||
B1062 | F9 | 18 | 5 November 2020 | F9-097 | — | GPS III SV04 Sacagawea | Success (40) | Success (OCISLY) | Landed on ASOG |
17 June 2021 | F9-122 ♺ | 224 days | GPS III SV05 Neil Armstrong | Success (40) | Success (JRTI) | ||||
16 September 2021 | F9-126 ♺ | 91 days | Dragon C207 Resilience (Inspiration4) | Success (39A) | Success (JRTI) | ||||
6 January 2022 | F9-135 ♺ | 112 days | Starlink × 49 (Group 4-5) | Success (39A) | Success (ASOG) | ||||
8 April 2022 | F9-147 ♺ | 92 days | Dragon C206 Endeavour (Axiom-1) | Success (39A) | Success (ASOG) | ||||
29 April 2022 | F9-151 ♺ | 21 days | Starlink x 53 (Group 4-16) | Success (40) | Success (JRTI) | ||||
8 June 2022 | F9-157 ♺ | 40 days | Nilesat-301 | Success (40) | Success (JRTI) | ||||
24 July 2022 | F9-167 ♺ | 46 days | Starlink × 53 (Group 4-25) | Success (39A) | Success (ASOG) | ||||
19 August 2022 | F9-171 ♺ | 26 days | Starlink × 53 (Group 4-27) | Success (40) | Success (ASOG) | ||||
20 October 2022 | F9-182 ♺ | 62 days | Starlink × 54 (Group 4-36) | Success (40) | Success (ASOG) | ||||
28 December 2022 | F9-193 ♺ | 69 days | Starlink × 54 (Group 5-1) | Success (40) | Success (ASOG) | ||||
12 February 2023 | F9-203 ♺ | 46 days | Starlink × 55 (Group 5-4) | Success (40) | Success (ASOG) | ||||
9 March 2023 | F9-209 ♺ | 25 days | OneWeb #17 | Success (40) | Success (LZ‑1) | ||||
27 May 2023 | F9-227 ♺ | 79 days | ArabSat 7B (Badr-8) | Success (40) | Success (JRTI) | ||||
28 July 2023 | F9-242 ♺ | 62 days | Starlink v2 × 22 (Group 6-7) | Success (40) | Success (ASOG) | ||||
18 October 2023 | F9-264 ♺ | 82 days | Starlink v2 × 22 (Group 6-23) | Success (40) | Success (JRTI) | ||||
28 November 2023 | F9-277 ♺ | 41 days | Starlink v2 × 23 (Group 6-30) | Success (40) | Success (JRTI) | ||||
29 January 2024 | F9-293 ♺ | 62 days | Starlink v2 × 23 (Group 6-38) | Success (39A) | Success (ASOG) | ||||
B1063 | F9 | 16 | 21 November 2020 | F9-099 | — | Sentinel-6 Michael Freilich | Success (4E) | Success (LZ‑4) | Refurbishing |
26 May 2021 | F9-119 ♺ | 186 days | Starlink × 60 (v1.0 L28) | Success (40) | Success (JRTI) | ||||
24 November 2021 | F9-129 ♺ | 182 days | DART | Success (4E) | Success (OCISLY) | ||||
25 February 2022 | F9-142 ♺ | 93 days | Starlink × 50 (Group 4-11) | Success (4E) | Success (OCISLY) | ||||
14 May 2022 | F9-153 ♺ | 78 days | Starlink × 53 (Group 4-13) | Success (4E) | Success (OCISLY) | ||||
11 July 2022 | F9-163 ♺ | 58 days | Starlink × 46 (Group 3-1) | Success (4E) | Success (OCISLY) | ||||
31 August 2022 | F9-173 ♺ | 51 days | Starlink × 46 (Group 3-4) | Success (4E) | Success (OCISLY) | ||||
28 October 2022 | F9-183 ♺ | 58 days | Starlink × 53 (Group 4-31) | Success (4E) | Success (OCISLY) | ||||
17 February 2023 | F9-204 ♺ | 112 days | Starlink × 51 (Group 2-5) | Success (4E) | Success (OCISLY) | ||||
15 April 2023 | F9-217 ♺ | 57 days | Transporter-7 | Success (4E) | Success (LZ‑4) | ||||
20 May 2023 | F9-225 ♺ | 35 days | Iridium NEXT × 5 (NEXT-9) OneWeb #19 | Success (4E) | Success (OCISLY) | ||||
7 July 2023 | F9-237 ♺ | 48 days | Starlink × 48 (Group 5-13) | Success (4E) | Success (OCISLY) | ||||
2 September 2023 | F9-252 ♺ | 57 days | SDA Tranche 0, Flight 2 | Success (4E) | Success (LZ‑4) | ||||
9 October 2023 | F9-262 ♺ | 37 days | Starlink v2 × 21 (Group 7-4) | Success (4E) | Success (OCISLY) | ||||
20 November 2023 | F9-275 ♺ | 42 days | Starlink v2 × 22 (Group 7-7) | Success (4E) | Success (OCISLY) | ||||
24 January 2024 | F9-292 ♺ | 65 days | Starlink v2 × 22 (Group 7-11) | Success (4E) | Success (OCISLY) | ||||
B1064 | FH side | 5 | 1 November 2022 | FH-004 | — | USSF-44 | Success (39A) | Success (LZ‑1) | In Hangar |
15 January 2023 | FH-005 ♺ | 75 days | USSF-67 | Success (39A) | Success (LZ‑2) | ||||
29 July 2023 | FH-007 ♺ | 195 days | Jupiter-3 (EchoStar-24) | Success (39A) | Success (LZ‑1) | ||||
13 October 2023 | FH-008 ♺ | 76 days | Psyche | Success (39A) | Success (LZ‑1) | ||||
29 December 2023 | FH-009 ♺ | 77 days | USSF-52 (Boeing X-37B OTV-7) | Success (39A) | Success (LZ‑1) | ||||
Planned | 10 October 2024 | FH-xxx ♺ | 286 days | Europa Clipper | Planned (39A) | No attempt | |||
B1065 | FH side | 5 | 1 November 2022 | FH-004 | — | USSF-44 | Success (39A) | Success (LZ‑2) | In Hangar |
15 January 2023 | FH-005 ♺ | 75 days | USSF-67 | Success (39A) | Success (LZ‑1) | ||||
29 July 2023 | FH-007 ♺ | 195 days | Jupiter-3 (EchoStar-24) | Success (39A) | Success (LZ‑2) | ||||
13 October 2023 | FH-008 ♺ | 76 days | Psyche | Success (39A) | Success (LZ‑2) | ||||
29 December 2023 | FH-009 ♺ | 77 days | USSF-52 (Boeing X-37B OTV-7) | Success (39A) | Success (LZ‑2) | ||||
Planned | 10 October 2024 | FH-xxx ♺ | 286 days | Europa Clipper | Planned (39A) | No attempt | |||
B1067 | F9 | 16 | 3 June 2021 | F9-120 | — | Dragon C209 (CRS-22) | Success (39A) | Success (OCISLY) | Awaiting Assignment |
11 November 2021 | F9-127 ♺ | 161 days | Dragon C210 Endurance (Crew-3) | Success (39A) | Success (ASOG) | ||||
19 December 2021 | F9-133 ♺ | 38 days | Türksat 5B | Success (40) | Success (ASOG) | ||||
27 April 2022 | F9-150 ♺ | 129 days | Dragon C212 Freedom (Crew-4) | Success (39A) | Success (ASOG) | ||||
14 July 2022 | F9-164 ♺ | 78 days | Dragon C208 (CRS-25) | Success (39A) | Success (ASOG) | ||||
19 September 2022 | F9-176 ♺ | 67 days | Starlink × 54 (Group 4-34) | Success (40) | Success (JRTI) | ||||
3 November 2022 | F9-184 ♺ | 45 days | Hotbird 13G | Success (40) | Success (JRTI) | ||||
16 December 2022 | F9-191 ♺ | 43 days | O3b mPOWER 1 & 2 | Success (40) | Success (ASOG) | ||||
26 January 2023 | F9-199 ♺ | 41 days | Starlink × 56 (Group 5-2) | Success (40) | Success (JRTI) | ||||
24 March 2023 | F9-213 ♺ | 57 days | Starlink × 56 (Group 5-5) | Success (40) | Success (ASOG) | ||||
14 May 2023 | F9-223 ♺ | 51 days | Starlink × 56 (Group 5-9) | Success (40) | Success (JRTI) | ||||
18 June 2023 | F9-233 ♺ | 35 days | Satria | Success (40) | Success (ASOG) | ||||
17 August 2023 | F9-247 ♺ | 60 days | Starlink v2 × 22 (Group 6-10) | Success (40) | Success (ASOG) | ||||
13 October 2023 | F9-263 ♺ | 57 days | Starlink v2 × 22 (Group 6-22) | Success (40) | Success (ASOG) | ||||
22 November 2023 | F9-276 ♺ | 40 days | Starlink v2 × 23 (Group 6-29) | Success (40) | Success (ASOG) | ||||
7 January 2024 | F9-288 ♺ | 46 days | Starlink v2 × 23 (Group 6-35) | Success (40) | Success (ASOG) | ||||
B1069 | F9 | 12 | 21 December 2021 | F9-134 | — | Dragon C209 (CRS-24) | Success (39A) | Success (JRTI) | Awaiting Assignment |
28 August 2022 | F9-172 ♺ | 250 days | Starlink × 54 (Group 4-23) | Success (40) | Success (ASOG) | ||||
15 October 2022 | F9-181 ♺ | 48 days |
Hotbird 13F and 2 Adidas Al Rihla |
Success (40) | Success (JRTI) | ||||
8 December 2022 | F9-188 ♺ | 54 days | OneWeb #15 | Success (39A) | Success (LZ‑1) | ||||
2 February 2023 | F9-201 ♺ | 56 days | Starlink × 53 (Group 5-3) | Success (39A) | Success (ASOG) | ||||
17 March 2023 | F9-212 ♺ | 43 days | SES-18 & 19 | Success (40) | Success (JRTI) | ||||
4 May 2023 | F9-221 ♺ | 48 days | Starlink × 56 (Group 5-6) | Success (40) | Success (ASOG) | ||||
23 June 2023 | F9-235 ♺ | 50 days | Starlink × 56 (Group 5-12) | Success (40) | Success (JRTI) | ||||
11 August 2023 | F9-246 ♺ | 49 days | Starlink v2 × 22 (Group 6-9) | Success (40) | Success (JRTI) | ||||
30 September 2023 | F9-260 ♺ | 50 days | Starlink v2 × 22 (Group 6-19) | Success (40) | Success (ASOG) | ||||
18 November 2023 | F9-274 ♺ | 49 days | Starlink v2 × 23 (Group 6-28) | Success (40) | Success (JRTI) | ||||
29 December 2023 | F9-285 ♺ | 41 days | Starlink v2 × 23 (Group 6-36) | Success (40) | Success (ASOG) | ||||
B1071 | F9 | 13 | 2 February 2022 | F9-139 | — | NROL-87 | Success (4E) | Success (LZ‑4) | Awaiting Assignment |
17 April 2022 | F9-148 ♺ | 74 days | NROL-85 | Success (4E) | Success (LZ‑4) | ||||
18 June 2022 | F9-159 ♺ | 62 days | SARah-1 | Success (4E) | Success (LZ‑4) | ||||
22 July 2022 | F9-166 ♺ | 34 days | Starlink × 46 (Group 3-2) | Success (4E) | Success (OCISLY) | ||||
5 October 2022 | F9-179 ♺ | 75 days | Starlink × 52 (Group 4-29) | Success (4E) | Success (OCISLY) | ||||
16 December 2022 | F9-190 ♺ | 72 days | SWOT | Success (4E) | Success (LZ‑4) | ||||
31 January 2023 | F9-200 ♺ | 46 days |
Starlink × 49 (Group 2-6)+ D-Orbit Starfield ION SCV009 |
Success (4E) | Success (OCISLY) | ||||
17 March 2023 | F9-211 ♺ | 45 days | Starlink × 52 (Group 2-8) | Success (4E) | Success (OCISLY) | ||||
12 June 2023 | F9-232 ♺ | 87 days | Transporter-8 | Success (4E) | Success (LZ‑4) | ||||
20 July 2023 | F9-240 ♺ | 38 days | Starlink v2 × 15 (Group 6-15) | Success (4E) | Success (OCISLY) | ||||
12 September 2023 | F9-255 ♺ | 54 days | Starlink v2 × 21 (Group 7-2) | Success (4E) | Success (OCISLY) | ||||
11 November 2023 | F9-272 ♺ | 60 days | Transporter-9 | Success (4E) | Success (LZ‑4) | ||||
8 December 2023 | F9-281 ♺ | 27 days | Starlink v2 × 22 (Group 7-8) | Success (4E) | Success (OCISLY) | ||||
B1072 | FH side | Planned | 30 April 2024 | FH-xxx | — | GOES-U | Planned (39A) | Planned (LZ-1) | Awaiting Launch |
B1073 | F9 | 12 | 14 May 2022 | F9-154 | — | Starlink × 53 (Group 4-15) | Success (40) | Success (JRTI) | Refurbishing |
29 June 2022 | F9-161 ♺ | 46 days | SES-22 | Success (40) | Success (ASOG) | ||||
10 August 2022 | F9-169 ♺ | 42 days | Starlink × 52 (Group 4-26) | Success (39A) | Success (ASOG) | ||||
24 September 2022 | F9-177 ♺ | 45 days | Starlink × 52 (Group 4-35) | Success (40) | Success (ASOG) | ||||
11 December 2022 | F9-189 ♺ | 78 days | HAKUTO-R Mission 1 | Success (40) | Success (LZ‑2) | ||||
7 February 2023 | F9-202 ♺ | 58 days | Amazonas Nexus | Success (40) | Success (JRTI) | ||||
15 March 2023 | F9-210 ♺ | 36 days | Dragon C209 (CRS-27) | Success (39A) | Success (ASOG) | ||||
19 April 2023 | F9-218 ♺ | 35 days | Starlink v2 × 21 (Group 6-2) | Success (40) | Success (ASOG) | ||||
12 June 2023 | F9-231 ♺ | 54 days | Starlink × 52 (Group 5-11) | Success (40) | Success (JRTI) | ||||
4 September 2023 | F9-253 ♺ | 84 days | Starlink v2 × 21 (Group 6-12) | Success (39A) | Success (JRTI) | ||||
8 November 2023 | F9-270 ♺ | 65 days | Starlink v2 × 23 (Group 6-27) | Success (40) | Success (JRTI) | ||||
15 January 2024 | F9-290 ♺ | 68 days | Starlink v2 × 23 (Group 6-37) | Success (40) | Success (ASOG) | ||||
B1075 | F9 | 9 | 19 January 2023 | F9-198 | — | Starlink × 51 (Group 2-4) | Success (4E) | Success (OCISLY) | Landed on OCISLY |
2 April 2023 | F9-215 ♺ | 73 days | SDA Tranche 0, Flight 1 | Success (4E) | Success (LZ‑4) | ||||
10 May 2023 | F9-222 ♺ | 38 days | Starlink × 51 (Group 2-9) | Success (4E) | Success (OCISLY) | ||||
22 June 2023 | F9-234 ♺ | 43 days | Starlink × 47 (Group 5-7) | Success (4E) | Success (OCISLY) | ||||
8 August 2023 | F9-245 ♺ | 47 days | Starlink v2 × 15 (Group 6-20) | Success (4E) | Success (OCISLY) | ||||
25 September 2023 | F9-259 ♺ | 48 days | Starlink v2 × 21 (Group 7-3) | Success (4E) | Success (OCISLY) | ||||
29 October 2023 | F9-267 ♺ | 34 days | Starlink v2 × 22 (Group 7-6) | Success (4E) | Success (OCISLY) | ||||
24 December 2023 | F9-284 ♺ | 56 days | SARah 2 & 3 | Success (4E) | Success (LZ‑4) | ||||
29 January 2024 | F9-294 ♺ | 36 days | Starlink v2 × 22 (Group 7-12) | Success (4E) | Success (OCISLY) | ||||
B1076 | F9 | 10 | 26 November 2022 | F9-187 | — | Dragon C211 (CRS-26) | Success (39A) | Success (JRTI) | Awaiting Assignment |
10 January 2023 | F9-196 ♺ | 45 days | OneWeb Flight #16 | Success (40) | Success (LZ‑1) | ||||
27 February 2023 | F9-206 ♺ | 48 days | Starlink v2 × 21 (Group 6-1) | Success (40) | Success (ASOG) | ||||
7 April 2023 | F9-216 ♺ | 39 days | Intelsat 40e/Tempo | Success (40) | Success (ASOG) | ||||
19 May 2023 | F9-224 ♺ | 42 days | Starlink v2 × 22 (Group 6-3) | Success (40) | Success (ASOG) | ||||
24 July 2023 | F9-241 ♺ | 66 days | Starlink v2 × 22 (Group 6-6) | Success (40) | Success (JRTI) | ||||
9 September 2023 | F9-254 ♺ | 47 days | Starlink v2 × 22 (Group 6-14) | Success (40) | Success (ASOG) | ||||
5 October 2023 | F9-261 ♺ | 26 days | Starlink v2 × 22 (Group 6-21) | Success (40) | Success (JRTI) | ||||
12 November 2023 | F9-273 ♺ | 38 days | O3b mPOWER 5 & 6 | Success (40) | Success (ASOG) | ||||
3 January 2024 | F9-287 ♺ | 52 days | Ovzon-3 | Success (40) | Success (LZ‑1) | ||||
B1077 | F9 | 9 | 5 October 2022 | F9-178 | — | Dragon C210 Endurance (Crew-5) | Success (39A) | Success (JRTI) | Awaiting Launch |
18 January 2023 | F9-197 ♺ | 105 days | GPS III SV06 Amelia Earhart | Success (40) | Success (ASOG) | ||||
18 February 2023 | F9-205 ♺ | 31 days | Inmarsat 6-F2 | Success (40) | Success (JRTI) | ||||
29 March 2023 | F9-214 ♺ | 39 days | Starlink x 56 (Group 5-10) | Success (40) | Success (JRTI) | ||||
5 June 2023 | F9-230 ♺ | 68 days | Dragon C208 (CRS-28) | Success (39A) | Success (ASOG) | ||||
3 August 2023 | F9-243 ♺ | 59 days | Galaxy 37 | Success (40) | Success (JRTI) | ||||
1 September 2023 | F9-251 ♺ | 29 days | Starlink v2 x 22 (Group 6-13) | Success (40) | Success (ASOG) | ||||
30 October 2023 | F9-268 ♺ | 59 days | Starlink v2 x 23 (Group 6-25) | Success (40) | Success (JRTI) | ||||
7 December 2023 | F9-280 ♺ | 38 days | Starlink v2 × 23 (Group 6-33) | Success (40) | Success (JRTI) | ||||
Planned | 30 January 2024 | F9-xxx ♺ | 54 days | Cygnus S.S. Patricia “Patty” Hilliard Robertson (CRS NG-20) | Planned (40) | Planned (LZ‑1) | |||
B1078 | F9 | 6 | 2 March 2023 | F9-207 | — | Dragon C206 Endeavour (Crew-6) | Success (39A) | Success (JRTI) | Awaiting Assignment |
28 April 2023 | F9-220 ♺ | 57 days | O3b mPOWER 3 & 4 | Success (40) | Success (JRTI) | ||||
4 June 2023 | F9-229 ♺ | 37 days | Starlink v2 x 22 (Group 6-4) | Success (40) | Success (JRTI) | ||||
7 August 2023 | F9-244 ♺ | 64 days | Starlink v2 x 22 (Group 6-8) | Success (40) | Success (ASOG) | ||||
16 September 2023 | F9-256 ♺ | 40 days | Starlink v2 x 22 (Group 6-16) | Success (40) | Success (JRTI) | ||||
3 December 2023 | F9-279 ♺ | 78 days | Starlink v2 x 23 (Group 6-31) | Success (40) | Success (ASOG) | ||||
B1080 | F9 | 5 | 21 May 2023 | F9-226 | — | Dragon C212 Freedom (Axiom Ax-2) | Success (39A) | Success (LZ‑1) | Refurbishing |
1 July 2023 | F9-236 ♺ | 41 days | Euclid | Success (40) | Success (ASOG) | ||||
27 August 2023 | F9-250 ♺ | 57 days | Starlink v2 x 22 (Group 6-11) | Success (40) | Success (JRTI) | ||||
22 October 2023 | F9-266 ♺ | 56 days | Starlink v2 x 23 (Group 6-24) | Success (40) | Success (ASOG) | ||||
18 January 2024 | F9-291 ♺ | 88 days | Dragon C212 Freedom (Axiom Mission 3) | Success (39A) | Success (LZ-1) | ||||
B1081 | F9 | 3 | 26 August 2023 | F9-249 | — | Dragon C210 Endurance (Crew-7) | Success (39A) | Success (LZ‑1) | Awaiting Assignment |
10 November 2023 | F9-271 ♺ | 76 days | Dragon C211 (CRS-29) | Success (39A) | Success (LZ‑1) | ||||
19 December 2023 | F9-282 ♺ | 39 days | Starlink v2 x 23 (Group 6-34) | Success (40) | Success (ASOG) | ||||
B1082 | F9 | 1 | 3 January 2024 | F9-286 | — | Starlink v2 × 21 (Group 7-9) | Success (4E) | Success (OCISLY) | Awaiting Assignment |
B1083 | F9 | Planned | 22 February 2024 | F9-xxx | — | Dragon C206 Endeavour (Crew-8) | Planned (39A) | Planned (LZ-1) | Awaiting Launch |
B1086 | FH side | Planned | 30 April 2024 | FH-xxx | — | GOES-U | Planned (39A) | Planned (LZ-1) | Awaiting Testing |
B1087 | FH core | Planned | 30 April 2024 | FH-xxx | — | GOES-U | Planned (39A) | No attempt | Testing at McGregor |
- Entries with colored background and ♺ symbol denote flights using refurbished boosters from previous flights.
- Mission names are presented in parentheses when applicable. indicates crewed launch under Commercial Crew Program (CCP). Adjacent logos are mission patches.
- Soccer balls were carried on a suborbital mission inside B1069
Statistics
Rockets from the Falcon 9 family have been launched 303 times over 14 years, resulting in 301 full successes (99.3%), one in-flight failure (SpaceX CRS-7), and one partial success (SpaceX CRS-1 delivered its cargo to the International Space Station (ISS), but a secondary payload was stranded in a lower-than-planned orbit). Additionally, one rocket and its payload AMOS-6 were destroyed before launch in preparation for an on-pad static fire test. The active version, Falcon 9 Block 5, has flown 238 missions, all full successes.
In 2022 Falcon 9 set a new record of 60 launches (all successful) by the same launch vehicle type in a calendar year. The previous record was held by Soyuz-U, which had 47 launches (45 successful) in 1979. In 2023 Falcon 9 family set a new record of 96 launches (all successful) by the same launch vehicle family in a calendar year. The previous record was held by R-7 rocket family, which had 63 launches (61 successful) in 1980.
The first rocket version Falcon 9 v1.0 was launched five times from June 2010 to March 2013, its successor Falcon 9 v1.1 15 times from September 2013 to January 2016, and the Falcon 9 Full Thrust 274 times from December 2015 to present. The latest Full Thrust variant, Block 5, was introduced in May 2018. While the Block 4 boosters were only flown twice and required several months of refurbishment, Block 5 versions were certified to sustain 10 flights and have since been recertified for 15 and then 20 flights per booster. SpaceX is currently planning to further increase the Falcon re-flight certification to 40 flights per booster, once 20 flights is reached.
The Falcon Heavy derivative consists of a strengthened Falcon 9 first stage as its center core, with two additional Falcon 9 first stages attached and used as boosters, both of which are fitted with an aerodynamic nosecone instead of a usual Falcon 9 interstage.
Falcon 9 first-stage boosters landed successfully in 268 of 279 attempts (96.1%), with 243 out of 247 (98.4%) for the Falcon 9 Block 5 version. A total of 241 re-flights of first stage boosters have all successfully launched their payloads.
Rocket configurations
- Falcon 9 v1.0
- Falcon 9 v1.1
- Falcon 9 Full Thrust
- Falcon 9 FT (reused)
- Falcon 9 Block 5 (new)
- Falcon 9 Block 5 (reused)
- Falcon Heavy
Launch sites
Launch outcomes
- Loss before launch
- Loss during flight
- Partial failure
- Success (commercial and government)
- Success (Starlink)
- Planned (commercial and government)
- Planned (Starlink)
Booster landings
- Ground-pad failure
- Drone-ship failure
- Ocean test failure
- Parachute test failure
- Ground-pad success
- Drone-ship success
- Ocean test success
- No attempt
- Controlled descent; ocean touchdown control failed; no recovery
- Passive reentry failed before parachute deployment
- Controlled descent; soft vertical ocean touchdown; no recovery
Booster turnaround time
This chart displays the turnaround time, in months, between two flights of each booster. As of January 2024, the shortest turnaround time was 21 days, for the sixth flight of B1062. Boosters that are still likely to be re-used (active fleet) are highlighted in bold and with an asterisk.
- Falcon 9 FT v1.2
- FT–Heavy sides
- Block 4
- FH flight 2
- Block 5 flight 2
- Block 5 flight 3
- Block 5 flight 4
- Block 5 flight 5
- Block 5 flight 6
- Block 5 flight 7
- FH flight 3
- FH flight 4
- FH flight 5
- Block 5 flight 8
- Block 5 flight 9
- Block 5 flight 10
- Block 5 flight 11
- Block 5 flight 12
- Block 5 flight 13
- Block 5 flight 14
- Block 5 flight 15
- Block 5 flight 16
- Block 5 flight 17
- Block 5 flight 18
- Block 5 flight 19
- Planned launch
- There was also an on-pad explosion; sometimes it is counted as a launch, resulting in 64 launches.
- Full Thrust Boosters B1023 and B1025 were converted to side boosters for the Falcon Heavy test flight of February 2018. This configuration will never fly again, as future Falcon Heavy missions have used a modified variant of Block 5 modules as side boosters.
Full Thrust booster flight counts
This chart lists how often boosters were flown. It is limited to the Full Thrust versions as previous versions were never recovered intact. The entries for Block 5 include active boosters that can make additional flights in the future. Blocks 1–3 made 27 flights with 18 boosters (1.5 flights per booster), Block 4 made 12 flights with 7 boosters (1.7 flights per booster). As of 29 January 2024, Block 5 made 238 flights with 26 boosters (9.2 flights per booster) with Falcon 9.
Block 5 booster flight status
This chart shows the status of Block 5 boosters that have flown; how often they have flown and whether they are still active, expended (i.e. no attempt was made to recover) or destroyed (i.e. recovery of the booster failed).
- Expended FH core
- Expended, other
- Destroyed
- Falcon 9 active
- Falcon Heavy Side active
- Converted Falcon 9/Falcon Heavy Side active
Falcon 9 FT booster timeline
This timeline displays all launches of Falcon 9 boosters starting with the first launch of Full Thrust. Active boosters that are expected to make additional flights in the future are marked with an asterisk. Single flights are marked with vertical lines. A short white gap indicates conversion between Falcon 9 and Falcon Heavy side formats. For boosters having performed several launches, colored bars indicate the turnaround time for each flight.
Synchronized recoveries of side-boosters
Most Falcon Heavy flights include landing of two side boosters onshore at the same time:
Notable boosters
Booster 0002 Grasshopper
Grasshopper consisted of "a Falcon 9 first-stage tank, a single Merlin-1D engine" with a height of 32 m (105 ft).
Grasshopper began flight testing in September 2012 with a brief, three-second hop, followed by a second hop in November 2012 with an 8-second flight that took the testbed approximately 5.4 m (18 ft) off the ground, and a third flight in December 2012 of 29 seconds duration, with extended hover under rocket engine power, in which it ascended to an altitude of 40 m (130 ft) before descending under rocket power to come to a successful vertical landing. Grasshopper made its eighth, and final, test flight on 7 October 2013, flying to an altitude of 744 m (2,441 ft) before making its eighth successful vertical landing. Grasshopper is retired.
Booster 1019
Falcon 9 B1019 was the first Full Thrust booster, and was first launched on 22 December 2015 for Falcon 9 flight 20 and landed on the Landing Zone 1 (LZ-1). It became the first orbital-class rocket booster to perform a successful return to launch site and vertical landing.
SpaceX decided not to fly the booster again. Rather, the rocket was moved a few miles north, refurbished by SpaceX at the adjacent Kennedy Space Center, to conduct a static fire test. This test aimed to assess the health of the recovered booster and the capability of this rocket design to fly repeatedly in the future. The historic booster is on display outside SpaceX headquarters in Hawthorne, California.
Booster 1021
Falcon 9 B1021 was the first booster to be re-flown and the first to land on a droneship. It was first launched on 8 April 2016 carrying a Dragon spacecraft and Bigelow Expandable Activity Module (BEAM) on the SpaceX CRS-8 mission and landed on an autonomous spaceport drone ship (ASDS). After recovery, inspections and refurbishing, it was launched again on 30 March 2017 for the SES-10 mission and recovered successfully a second time. This event marks a milestone in SpaceX's drive to develop reusable rockets and reduce launch costs. Following the second flight, SpaceX stated that they plan to retire this booster and donate it to Cape Canaveral for public display. It was later put on public display outside Dish Network's headquarters in Littleton, Colorado in October 2023.
Boosters 1023 and 1025
B1023 became the third orbital-class rocket to land on a droneship after launching Thaicom 8 into a geostationary transfer orbit on 27 May 2016. It was an unusually hard landing that crushed the energy absorbers on at least one of the landing legs, causing the booster to "walk" across the droneship and lean over, but the rocket arrived safely at Port Canaveral. B1025 successfully launched the CRS-9 resupply mission on its maiden flight on 18 July 2016 and landed on LZ-1, being the first after B1019 to do so. The mission carried a new docking adapter specifically designed for autonomous spacecraft to the ISS in preparation for Dragon 2 resupply and Commercial Crew missions.
B1023 and B1025 were assigned the role of side boosters for the Falcon Heavy test flight in 2017, after which they underwent separate static fire tests. The boosters were mated to a newly built Falcon Heavy core, B1033, for the flight. The maiden flight of Falcon Heavy on 6 February 2018 launched SpaceX CEO Elon Musk's Tesla Roadster and a dummy astronaut into a Mars-crossing heliocentric orbit. The boosters successfully separated from the core and performed a synchronized landing on LZ-1 and the adjacent LZ-2. B1023 is on display at the Kennedy Space Center Visitor Complex in its Falcon Heavy side booster configuration.
Booster 1046
B1046 was the first Block 5, the final version of the SpaceX Falcon 9. It was first launched on 11 May 2018, carrying Bangabandhu-1, Bangladesh's first geostationary communications satellite. This marked the 54th flight of the Falcon 9 and the first flight of the Falcon 9 Block 5. After completing a successful ascent, B1046 landed on the drone ship Of Course I Still Love You. After inspection and refurbishment, B1046 was launched a second time on 7 August 2018, carrying the Telkom-4 (Merah Putih) satellite. The Telkom-4 mission marked the first time an orbital-class rocket booster launched two GTO missions. This was also the first re-flight of a Block 5 booster. Four months after the Telkom-4 mission, B1046 arrived at Vandenberg Air Force Base to support the SSO-A mission. Following delays for additional satellite checks, liftoff occurred from SLC-4E on 3 December 2018. This marked the first time that the same orbital-class booster flew three times. Its fourth and last mission launched a Crew Dragon capsule up to the point of maximum dynamic pressure, where it separated from the rocket to test its abort system in flight to validate the system's safety for crews. After separation of Falcon and Dragon, B1046 was compromised by aerodynamic forces.
Booster 1048
B1048 was the third Falcon 9 Block 5 to fly and the second Block 5 booster to re-fly, and the first booster ever to be launched four, then five times. During the last launch, an engine shut down seconds before the planned shutdown, becoming only the second time a Merlin engine failed since the failure during the SpaceX CRS-1 in October 2012. The primary mission was unaffected and the Starlink payload deployed successfully, further confirming the reliability of the rocket due to redundancy of the engines. With reduced thrust, B1048 was unable to sufficiently slow down its descent, and thus was unable to land.
Booster 1049
B1049 was the oldest Falcon 9 booster on active duty until its last flight on Nov 22, 2022, after which this title went to B1052. It was the first to successfully launch and land six, then seven times, and the second to launch and land eight, nine, and then ten times respectively. It launched two commercial payloads, Telstar 18V and the eighth Iridium NEXT batch, and eight internal Starlink batches. B1049 has been seen with its landing legs and grid fins removed indicating that it will be expended on its next flight. The final flight of B1049 was originally thought to be O3b mPower 4-6 but a regrouping of the launches meant that an expendable booster was no longer required. It was then originally planned that B1049's last flight would be the launch of Nilesat-301 however, plans changed and the mission was flown with a recoverable booster (B1062.7). B1049 flew the Eutelsat-10B communications satellite on November 22, 2022. This mission was its last flight.
Booster 1050
B1050 launched for the first time on 5 December 2018. A grid fin malfunction occurred shortly after the entry burn, resulting in the booster performing a controlled landing in the ocean instead of the planned ground pad landing.
No future flights for B1050 were planned, and it was scrapped due to its damage.
Booster 1051
B1051 was the sixth Falcon 9 Block 5 booster built. On its maiden flight on 2 March 2019, it carried a Crew Dragon into orbit on the Demo-1 mission. It then flew its second mission out of Vandenberg AFB launching the Radarsat constellation. It then flew 4 Starlink missions and launched SXM-7, totaling 5 flights in 2020 alone, and becoming the first Falcon 9 to launch a commercial payload on its seventh flight. On 18 December 2021, it flew for a record 11th time. It was the first booster to be used eight, nine, ten, eleven, and twelve times respectively. It flew for the final time on 12 November 2022 for the Intelsat G-31/G-32 mission, and was expended.
Booster 1056
B1056 first launched on 4 May 2019, carrying a Cargo Dragon to the ISS. Because of the failure of the static test fire of Crew Dragon C204's SuperDraco abort engines on LZ-1, it landed on a drone ship instead. It flew three more times. On 17 February 2020, B1056 was planned to perform the 50th orbital-class rocket landing, just 27 days after its previous launch. The booster soft-landed in the Atlantic Ocean and was severely damaged after launching Starlink satellites into orbit, becoming the first flight-proven Block 5 booster to fail landing.
Booster 1058
Falcon 9 B1058 was first launched on 30 May 2020, from Kennedy Space Center Launch Complex 39A (Apollo 11 launch site). It carried NASA astronauts Doug Hurley and Bob Behnken to the International Space Station. It was the first crewed orbital spaceflight launched from the United States since the final Space Shuttle mission, and the first crewed flight test of Dragon 2. It was the first crewed orbital spaceflight by a private company. The booster was the first and only Falcon 9 booster to feature NASA's worm logo and meatball insignia, which was reintroduced after last being used in 1992.
On 11 September 2022, it flew for the 14th time and became the first booster to be recovered 14 times. On 17 December 2022, it was also the first booster to fly and land for the 15th time. On 10 July 2023, it broke the reusability record of flying and landing an orbital-class rocket booster for the 16th time and later went on to be the first to complete 17, 18, and 19 launches in the same year.
Despite the successful landing in its nineteenth flight, the booster tipped over during transit due to rough seas and high winds. SpaceX has already equipped newer Falcon boosters with upgraded landing legs that have the capability to self-level and mitigate this type of issue.
Booster 1061
Falcon 9 B1061 first launched Crew-1 to the ISS in November 2020, the first operational flight of Crew Dragon, and landed on a drone ship. It became the first booster to fly crew twice as well as the first reused booster to fly crew as a part of the Crew-2 mission. This first stage went on to complete additional missions. B1061 is the only booster to land on all of SpaceX's different landing zones and drone ships, except LZ-2.
Booster 1062
Falcon 9 B1062 launched Inspiration4 in 2021, operated by SpaceX on behalf of Shift4 Payments CEO Jared Isaacman. The mission launched the Crew Dragon Resilience on 16 September 2021 at 00:02:56 UTC from the Florida Kennedy Space Center's Launch Complex 39A atop a Falcon 9 launch vehicle, placed the Dragon capsule into low Earth orbit, and ended successfully on 18 September 2021 at 23:06:49 UTC, when the Resilience splashed down in the Atlantic Ocean. B1062 holds the record for the fastest booster turnaround time at 21 days and 4 hours between 8 April 2022 (Axiom-1) and 29 April 2022 (Starlink Group 4–16) beating the previous record of 27 days and 6 hours held by B1060. This was the first time a booster had flown twice in the same calendar month. According to the SpaceX webcast of the Starlink Group 4-16 mission, the booster spent just nine days in refurbishment.
Booster 1069
Falcon 9 B1069 launched SpaceX CRS-24 to ISS in December 2021 for NASA. SpaceX achieved the feat of 100 successful orbital rocket booster landings in this mission, coinciding with the sixth anniversary of its first booster landing. The rough seas led to the Octograbber robot not being able to secure the booster to the deck, leading to both the booster, droneship and the Octagrabber robot being heavily damaged in transit. It took months for SpaceX to refurbish B1069, returning into service only on Group 4-23 mission in August 2022.
On its next flight for Eutelsat Hotbird 13F, B1069 included a hosted promotional payload by FIFA, that was a box powered by Starlink containing two Adidas Al Rihla (the Journey) balls, that were to be used in 2022 FIFA World Cup in Qatar. These match balls were launched and brought back by landing on the droneship surviving the stresses of re-entry. Later, they were taken out and shipped back to Qatar for the world cup. This was the first payload on a Falcon 9 booster itself and demonstrated the reusability. The balls' flight by SpaceX was, in part, a promotion for the company's Starlink satellite internet service. An associated website invited World Cup attendees to visit the Starlink office in Doha.
Reuse and recovery records
- B1012 featured the first recovery attempt on a droneship on 10 January 2015. The attempt was unsuccessful.
- B1019 became the first orbital booster ever to be recovered after a launch. After it landed at LZ-1 on 22 December 2015, it was retired and put on display at SpaceX Headquarters in Hawthorne, California.
- B1021 became the first booster ever to land on a droneship. On 8 April 2016, B1021 touched down on Of Course I Still Love You marking SpaceX's second successful landing.
- B1021 became the first booster to fly a second time, on F9 Flight 32 when it launched the SES-10 satellite on 30 March 2017. After its second successful landing, it was retired and put on display at Cape Canaveral Air Force Station.
- B1023 and B1025 achieved the first synchronized landings when they touched down together at LZ-1 and LZ-2 respectively after the Falcon Heavy Test Flight on 6 February 2018.
- B1046 (the first Block 5 booster) became the first to launch three times, carrying Spaceflight SSO-A on 3 December 2018.
- B1048 was the first booster to be recovered four times on 11 November 2019, and the first to perform a fifth flight on 18 March 2020, but the booster was lost during re-entry.
- B1049 was the first booster to be recovered five times on 4 June 2020, six times on 18 August 2020, and seven times on 25 November 2020.
- B1051 became the first booster to be recovered eight times on 20 January 2021, nine times on 14 March 2021, and ten times on 9 May 2021, achieving one of SpaceX's milestone goals for reuse. It then became the first booster to be recovered eleven times on 18 December 2021 and twelve times on 19 March 2022.
- B1060 became the first booster to fly thirteen times on 17 June 2022.
- B1062 booster holds the record for fastest turnaround at 21 days. It launched on 8 April and again on 29 April 2022.
- B1023 holds the record for the farthest downrange droneship landing from Falcon 9 at 681 km on 27 May 2016 and B1055 holds the record of 1236 km downrange from Falcon Heavy.
- B1058 became the first booster to fly fourteen times on 11 September 2022, fifteen times on 17 December 2022, sixteen times on 10 July 2023, seventeen times on 20 September 2023, eighteen times on 4 November 2023 and nineteen times on 23 December 2023.
- B1069 launched and returned a hosted box containing two FIFA 2022 World Cup Adidas Al Rihla on 15 October 2022 for a sub-orbital flight, the first payload on a Falcon 9 booster.
- B1061 became the only booster on 30 December 2022 to launch from all SpaceX's different launch sites and on all of SpaceX's different landing zones and drone ships (except rarely used LZ-2 that is located nearby LZ-1).
- B1080 became the first booster to land onshore after launching a crewed mission (Ax-2) on 21 May 2023.
See also
- List of Falcon 9 and Falcon Heavy launches
- Lists of spacecraft
- Category:Individual Falcon 9 boosters