Guwahati–Lumding section

Guwahati–Lumding section (including Chaparmukh-Silghat Town & Chaparmukh-Mairabari branch lines)
Chaparmukh Junction an important railway station on Guwahati–Lumding section
Overview
Status Operational
Owner Indian Railways
Locale Assam
Termini
Service
Operator(s) Northeast Frontier Railway zone
History
Opened 1900
Technical
Line length 181 km (112 mi)
Number of tracks 1
Track gauge 1,676 mm (5 ft 6 in)
Old gauge 1,000 mm ( 3 ft 3+38 in)
Electrification Ongoing
Route map

km
Up arrow
0
Guwahati
4
New Guwahati
5
Noonmati
10
Satgaon Army Halt
8
Narangi
14
Panikhaiti
19
Thakurkuchi
26
Panbari
33
Digaru
Kamalajori
010
38
0
Tetelia
45
Kamrup Khetri
Byrnihat
022
51
Barahu
under construction ↑
planned ↓
56
Jagi Road
Sohkhwai
032
64
Aujuri
Lailad
040
70
Sonuabori
Nonghpoh
048
75
Dharamtul
Mawkyndah
054
82
Thekeraguri
Umtsaor
063
90
Chaparmukh Junction
Nongseter
071
Kyrdemkulai
084
94
Raha
Umroi
097
102
Phulaguri
Umpling
109
107
Bebejia
Mawshaepah
121
109
Senchoa Junction
Shillong
130
115
Haibargaon
Nagaon
116
125
Rupahigaon
Puranigudam
126
131
Tarabari
Samaguri
135
135
Juria
Amoni
143
139
Dagaon
Salona
148
144
Balikotia
Salona-Khumtai line
(planned)
0Left arrow
147
Batadrawa
Kallyden Siding
153
153
Dhing Bazar
Solal Siding
158
156
Dhing
Jakhalabandha
163
159
Mairabari
Silghat Town
171
planned bridge over
Brahmaputra River
Silghat Town–Dekargaon
line (planned)
0Down arrow
99
Laopani
107
Kampur
118
Jamunamukh
128
Jugijan
135
Hojai
142
Dhalpukhuri
149
Lanka
154
Habaipur
165
Lamsakhang
171
Patharkhola
Left arrow
179
Lumding Junction
Down arrow
km
km

Source: Indian Railway Time Table

The Guwahati–Lumding section is a broad-gauge railway line connecting Guwahati and Lumding Junction. The 179-kilometre (111 mi) long railway line operates in the Indian state of Assam. It is under the jurisdiction of Northeast Frontier Railway zone.

History

In the pre-partition days, Assam was linked to Chittagong through the Akhaura-Kulaura-Chhatak Line and Akhaura-Laksam-Chittagong Line. The Chittagong link had been constructed in response to the demand of the Assam tea planters for a railway link to Chittagong port. Assam Bengal Railway started construction of a railway track on the eastern side of Bengal in 1891. A 150-kilometre long (93 mi) track between Chittagong and Comilla was opened to traffic in 1895. The Comilla-Akhaura-Kulaura-Badarpur section was opened in 1896–1898 and finally extended to Lumding in 1903. The Assam Bengal Railway constructed a branch line to Guwahati, connecting the city to the eastern line in 1900. During the 1900–1910 period, the Eastern Bengal Railway built the Golakganj-Amingaon branch line, thus connecting the western bank of the Brahmaputra to the western line.

Broad gauge

The railway tracks from Guwahati to Lumding and from Chaparmukh to Haibargaon were upgraded from metre gauge to 5 ft 6 in (1,676 mm) broad gauge in 1994.

Line doubling

The Guwahati-Lumding-Dibrugarh line was proposed to be doubled in the Railway Budget for 2011–12.

The 44.92 km (28 mi) long Lumding-Hojai doubling project was sanctioned in 2012–13. The Lumding Hojai patch doubling was completed on 10 July 2019. The 30.50 km (19 mi) long New Guwahati-Digaru doubling project was completed in 2012–13.

Railway reorganisation

The Assam Railway and Trading Company Limited was merged with Assam Bengal Railway in 1945. With partition, Assam Bengal Railway was split up and railway lines in Assam became Assam Railway. In 1952, North East Railway was formed with the amalgamation of Assam Railway, Oudh-Tiirhut Railway and the Kanpur-Achnera section of Bombay, Baroda and Central India Railway. Northeast Frontier Railway was created with a part of NE Railway in 1958.